Examination of Estimates of Expenditure 2003-04<br />

CONTROLLING OFFICER’S REPLY TO<br />

INITIAL WRITTEN QUESTION<br />

Head : 39 - Drainage Services Department Subhead (No. & title) : Question Serial No.<br />

Programme : (2) Sewage Services<br />

1444<br />

Controlling Officer : Direc<strong>to</strong>r of Drainage Services<br />

Direc<strong>to</strong>r of Bureau : Secretary for the Environment, Transport and Works<br />

Question : According <strong>to</strong> the Estimates, the provision for the programme “Sewage<br />

Services” is $28.1 million higher than that of last year, mainly due <strong>to</strong> the<br />

expenditure for operating new plants. As such, will the Government please<br />

list out the breakdown of the operating cost for each of the new plants and the<br />

proportion <strong>to</strong> the $28.1 million?<br />

Asked by : Hon. IP Kwok-him<br />

Reply : The increase in provision of $28.1 million for 2003-04 is mainly due <strong>to</strong> increased<br />

requirements for operating new plants, and for maintenance <strong>to</strong> cope with the<br />

growing length of sewers and ageing of sewage facilities. Out of the $28.1 million,<br />

only $3.8 million is related <strong>to</strong> the full commissioning of new sewage treatment<br />

facilities. The details of operating costs are listed below :-<br />

Go<strong>to</strong><strong>to</strong>p<br />

Operation &<br />

maintenance<br />

% <strong>to</strong><br />

Description<br />

Electricity Spare parts services Total $28.1M<br />

$M $M $M $M<br />

Chi Ma Wan Sewage Treatment<br />

Plant<br />

0.1 0.1 0.4 0.6 2.1%<br />

Cape Collinson Correctional 0.0* 0.1 0.1 0.2 0.7%<br />

Institution Sewage Treatment Plant<br />

Telegraph Bay Sewage Treatment<br />

Works<br />

0.4 0.2 1.9 2.5 8.9%<br />

Installation of a Sequencing Batch<br />

Reac<strong>to</strong>r and Ultraviolet Disinfection<br />

Equipment at Ma Po Ping Rotary<br />

0.0* 0.0 0.3 0.3 1.1%<br />

Biological Contac<strong>to</strong>r Sewage<br />

Treatment Plant<br />

Kam Tin Sewage Treatment Plant 0.0* 0.1 0.1 0.2 0.7%<br />

Total additional requirements 0.5 0.5 2.8 3.8 13.5%<br />

* Rounding effect.<br />

Signature<br />

Name in block letters R.T.K. CHEUNG<br />

Post Title Direc<strong>to</strong>r of Drainage Services<br />

Date 20 March 2003<br />

Reply Serial No.<br />

ETWB(E)022