2 The Planning Process<br />

2.1 Preparing a Comprehensive Conservation Plan<br />

The purpose of the Comprehensive Conservation Plan (CCP) for the Seal Beach NWR is to guide<br />

the management of the Refuge over the next 15 years. The CCP <strong>and</strong> an associated EA have been<br />

prepared to meet the dual compliance requirements of the Improvement Act <strong>and</strong> NEPA.<br />

Development of the CCP is also guided by Refuge Planning Policy as outlined in Part 602, FW 1, 3,<br />

<strong>and</strong> 4 of the <strong>Service</strong> Manual (USFWS 2000). <strong>Service</strong> policy, the Improvement Act, <strong>and</strong> NEPA<br />

provide specific guidance for the planning process, such as seeking public involvement throughout<br />

the planning process <strong>and</strong> analyzing a “reasonable” range of management alternatives, including a<br />

“no action” alternative, that reflect current conditions <strong>and</strong> management strategies. The<br />

management alternatives analyzed in this document, including the proposed action (Alternative C),<br />

are described in detail in Chapter 3.<br />

Key steps in the CCP <strong>and</strong> parallel NEPA processes include:<br />

Preplanning<br />

Public scoping <strong>and</strong> involvement<br />

Identifying issues, opportunities, <strong>and</strong> concerns<br />

Defining <strong>and</strong> revising vision statement <strong>and</strong> Refuge goals<br />

Developing <strong>and</strong> assessing alternatives<br />

Identifying preferred alternative plan<br />

Draft CCP <strong>and</strong> EA<br />

Revising draft documents <strong>and</strong> releasing final CCP<br />

Implementing the CCP<br />

Monitoring/feedback<br />

Figure 2-1 shows the overall CCP steps <strong>and</strong> process in a linear cycle, but the planning process is<br />

actually a non-sequential movement among the steps, with many revisions occurring during plan<br />

development.<br />

2.2 Preplanning<br />

Preplanning for this CCP began in October 2006 with the establishment of a core planning team.<br />

The team consists of the Refuge Manager, a refuge planner, <strong>and</strong> other members of the San Diego<br />

NWR Complex, as well as Environmental Program staff at NWSSB. Appendix B lists the<br />

members of the planning team, as well as other participants who provided important insight<br />

regarding planning issues <strong>and</strong> ongoing refuge management. The State was invited to participate<br />

as a core team member, but due to time constraints, was not available to participate at this level.<br />

The State did however participate as part of an extended planning team.<br />

One of the first tasks of the core planning team was to identify preliminary issues, concerns, <strong>and</strong><br />

opportunities. To do this, the team relied on information derived from wildlife <strong>and</strong> habitat<br />

monitoring <strong>and</strong> field experience associated with the past management of the Refuge. Through this<br />

process, three primary areas of focus were identified: habitat management, endangered species<br />

Draft Comprehensive Conservation Plan/Environmental Assessment 2-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!