– In addition to Alwyn and the Central Graben, a third area, West of<br />
Shetland, is undergoing development. TOTAL increased its equity<br />
stake to 80% in the Laggan and Tormore fields in early 2010.<br />
The decision to develop the Laggan/Tormore fields was made in<br />
March 2010 and production is scheduled to start in 2014 with an<br />
expected capacity of 90 kboe/d. The joint development scheme<br />
selected by TOTAL and its partner includes sub-sea production<br />
facilities and off-gas treatment (gas and condensates) at a plant<br />
located near the Sullom Voe terminal in the Shetland Islands. The<br />
gas would then be exported to the Saint-Fergus terminal via a<br />
new pipeline connected to the Frigg gas pipeline (FUKA).<br />
In 2010, the Group’s stake in the P967 license (operator),<br />
which includes the Tobermory gas discovery, increased to 50%<br />
from 43.75%. This license is located north of Laggan/Tormore.<br />
In early <strong>2011</strong>, a gas and condensate discovery was made on<br />
the Edradour license (75%, operator), near Laggan and Tormore.<br />
The development of Edradour using the infrastructures in place<br />
is being examined.<br />
TOTAL has stakes in ten assets operated by third parties, the most<br />
important in terms of reserves being the Bruce (43.25%) and Alba<br />
(12.65%) fields. The Group disposed of its stake in the Nelson field<br />
(11.5%) in 2010.<br />
2.3.7. Middle East<br />
In <strong>2011</strong>, TOTAL’s production in the Middle East was 570<br />
kboe/d, representing 24% of the Group’s overall production,<br />
<strong>com</strong>pared to 527 kboe/d in 2010 and 438 kboe/d in 2009.<br />
In the United Arab Emirates, where TOTAL has had operations since<br />
1939, the Group’s production was 240 kboe/d in <strong>2011</strong>, <strong>com</strong>pared<br />
to 222 kboe/d in 2010 and 214 kboe/d in 2009. The increase in<br />
production in <strong>2011</strong> was mainly due to higher production by Abu Dhabi<br />
Company for Onshore Oil Operations (ADCO) and Abu Dhabi<br />
Marine (ADMA).<br />
In Abu Dhabi, TOTAL holds a 75% stake in the Abu Al Bu Khoosh<br />
field (operator), a 9.5% stake in ADCO, which operates the five<br />
major onshore fields in Abu Dhabi, and a 13.3% stake in ADMA,<br />
which operates two offshore fields. TOTAL also has a 15% stake in<br />
Abu Dhabi Gas Industries (GASCO), which produces LPG and<br />
condensates from the associated gas produced by ADCO, and<br />
a 5% stake in Abu Dhabi Gas Liquefaction Company (ADGAS),<br />
which produces LNG, LPG and condensates.<br />
In early 2009, TOTAL signed agreements for a 20-year extension of<br />
its stake in the GASCO joint venture starting on October 1, 2008.<br />
In early <strong>2011</strong>, TOTAL and IPIC, a government-owned entity in Abu Dhabi,<br />
signed a Memorandum of Understanding with a view to developing<br />
projects of <strong>com</strong>mon interest in the upstream oil and gas sectors.<br />
The Group has a 24.5% stake in Dolphin Energy Ltd. alongside<br />
Mubadala, a <strong>com</strong>pany owned by the government of the Abu Dhabi<br />
Emirate, to market gas produced primarily in Qatar to the United<br />
Arab Emirates.<br />
The Group also owns 33.33% of Ruwais Fertilizer Industries (FERTIL),<br />
which produces urea. FERTIL 2, a new project, was launched in 2009<br />
to build a new granulated urea unit with a capacity of 3,500 t/d<br />
(1.2 Mt/y). This project is expected to allow FERTIL to more than<br />
(1) TOTAL’s indirect stake in Qalhat LNG through its stake in Oman LNG.<br />
Business overview<br />
Upstream 2<br />
double production so as to reach nearly 2 Mt/y in January 2013.<br />
In Iraq, TOTAL bid in 2009 and 2010 on the three calls for tenders<br />
launched by the Iraqi Ministry of Oil. The PetroChina-led consortium<br />
that includes TOTAL (18.75%) was awarded the development and<br />
production contract for the Halfaya field during the second call for<br />
tenders held in December 2009. This field is located in the province<br />
of Missan, north of Basra. The agreement became effective in<br />
March 2010 and the preliminary development plan was approved<br />
by the Iraqi authorities in September 2010. Development operations<br />
started with the shooting of the 3D seismic survey, drilling and the<br />
construction of surface facilities. A production level of 70 kb/d of oil<br />
is expected to be reached in 2012.<br />
In Iran, the Group’s production under buy back agreements was<br />
zero in <strong>2011</strong>, having been 2 kb/d in 2010 and 8 kb/d in 2009.<br />
For additional information on TOTAL’s operations in Iran, see<br />
Chapter 4 (Risk Factors).<br />
In Oman, the Group’s production was 36 kboe/d in <strong>2011</strong>, stable<br />
<strong>com</strong>pared to 2010 and 2009. TOTAL produces oil mainly on<br />
Block 6 as well as on Block 53 and liquefied natural gas through its<br />
stakes in the Oman LNG (5.54%)/Qalhat LNG (2.04% (1) )<br />
liquefaction plant, which has a capacity of 10.5 Mt/y.<br />
In Qatar, where TOTAL has had operations since 1936, the Group<br />
has equity stakes in the Al Khalij field (100%), the NFB Block (20%)<br />
in the North field, the Qatargas 1 liquefaction plant (10%), Dolphin<br />
(24.5%) and train 5 of Qatargas 2 (16.7%). The Group’s production<br />
was 155 kboe/d in <strong>2011</strong>, <strong>com</strong>pared to 164 kboe/d in 2010<br />
and 141 kboe/d in 2009.<br />
– The production contract for Dolphin, signed in 2001 with stateowned<br />
Qatar Petroleum, provides for the sale of 2 Bcf/d of gas<br />
from the North Field for a 25-year period. The gas is processed<br />
in the Dolphin plant in Ras Laffan and exported to the United<br />
Arab Emirates through a 360 km gas pipeline.<br />
– Production from train 5 of Qatargas 2, which started in<br />
September 2009, reached its full capacity (7.8 Mt/y) at year-end<br />
2009. TOTAL has owned an equity stake in this train since 2006.<br />
In addition, TOTAL takes part of the LNG produced in <strong>com</strong>pliance<br />
with the contracts signed in 2006, which provide for the purchase<br />
of 5.2 Mt/y of LNG from Qatargas 2 by the Group.<br />
The Group also has a 10% stake in Laffan Refinery, a condensate<br />
splitter with a capacity of 146 kb/d that started up in September 2009.<br />
Finally, since May <strong>2011</strong> the Group has been a partner (25%) in the<br />
offshore BC exploration license.<br />
In Syria, TOTAL is present on the Deir Ez Zor license (100%,<br />
operated by DEZPC, 50% of which is owned by TOTAL) and<br />
through the Tabiyeh contract that became effective in<br />
October 2009. The Group’s production from these two assets<br />
was 53 kboe/d in <strong>2011</strong>, <strong>com</strong>pared to 39 kboe/d in 2010 and 20<br />
kboe/d in 2009. In early December <strong>2011</strong>, TOTAL ceased its<br />
activities that contribute to oil and gas production in Syria.<br />
For additional information on TOTAL’s operations in Syria, see<br />
Chapter 4 (Risk Factors).<br />
In Yemen, where TOTAL has had operations since 1987, the Group’s<br />
production was 86 kboe/d in <strong>2011</strong>, <strong>com</strong>pared to 66 kboe/d<br />
in 2010 and 21 kboe/d in 2009.<br />
TOTAL has an equity stake in the Yemen LNG project (39.62%).<br />
<strong>Registration</strong> Document <strong>2011</strong>. TOTAL 27