Functions<br />

2.1 General<br />

Special Considerations on Auto-Transformers<br />

52<br />

As mentioned above, the common windings on auto-transformers must always be defined as S1 and S2. A third<br />

side may be present if the compensation winding is dimensioned as power winding (tertiary winding) and<br />

accessible (figure 2-5). In this example we have 3 sides and 4 assigned measuring locations. During<br />

parametrization of the auto-transformer, one must always start with the auto-winding.<br />

Figure 2-5 Topology of an auto-transformer with a compensation winding which is used as tertiary winding<br />

Sides:<br />

S1 High voltage side of the main protected object (auto-transformer)<br />

S2 Low voltage side of the main protected object (auto-transformer)<br />

S3 Tertiary winding side (accessible compensation winding) of the main protected object<br />

Measuring locations 3-phase, assigned:<br />

M1 Measuring location, assigned to the main protected object, side 1<br />

M2 Measuring location, assigned to the main protected object, side 1<br />

M3 Measuring location, assigned to the main protected object, side 2<br />

M4 Measuring location, assigned to the main protected object, side 3<br />

A further tap of the winding can also be used as the third side. Be aware that the numbering sequence always<br />

starts with the auto-connected winding: full winding, taps, and then accessible delta winding if required.<br />

Auto-Transformer Banks<br />

If three single-phase auto-transformers are arranged as a power transformer bank, the connections of the starpoint<br />

leads of the auto-windings are accessible and often provided with current transformers. During configuration<br />

of the functional scope in section 2.1.3 you have decided whether a differential protection must be realised<br />

via the entire transformer bank, or whether you prefer a current comparison via the winding of each phase<br />

by means of current law.<br />

Differential protection over the entire power transformer bank:<br />

Regarding the first case, figure 2-6 gives an example of a 3-phase presentation. In this example we have 3<br />

sides and 3 assigned three-phase measuring locations. The auto-connected winding terminals form the sides<br />

S1 (full winding) and S2 (tap) with the assigned 3-phase measuring locations M1 and M2. As the delta winding<br />

functions both as the tertiary winding and the compensation winding, it is the third side S3 with measuring<br />

location M3.<br />

<strong>SIPROTEC</strong>, 7UT6x, Manual<br />

C53000-G1176-C230-2, Release date 06.2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!