29.06.2013 Views

entire - Deutsche Bank Annual Report 2012

entire - Deutsche Bank Annual Report 2012

entire - Deutsche Bank Annual Report 2012

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Deutsche</strong> <strong>Bank</strong> 01 – Management <strong>Report</strong> 105<br />

Financial <strong>Report</strong> 2010 Risk <strong>Report</strong><br />

We maintain a number of captive insurance companies, both primary and re-insurance companies. However,<br />

insurance contracts provided are only considered in the modeling/calculation of insurance-related reductions of<br />

operational risk capital requirements where the risk is re-insured in the external insurance market.<br />

The regulatory capital figure includes a deduction for insurance coverage amounting to € 467 million. Currently,<br />

no other risk transfer techniques beyond insurance are recognized in the AMA model.<br />

CI/D selects insurance partners in strict compliance with the regulatory requirements specified in the Solvency<br />

Regulations and the Operational Risks Experts Group recommendation on the recognition of insurance in<br />

advanced measurement approaches. The insurance portfolio, as well as CI/D activities are audited by Group<br />

Audit on a periodic basis.<br />

Operational Risk at Postbank<br />

Postbank’s approach to Operational Risk Management is largely comparable to <strong>Deutsche</strong> <strong>Bank</strong>’s approach.<br />

The Management Board of the Postbank is solely responsible for the management, control, and monitoring of<br />

operational risk. The Operational Risk Committee (ORK) commissioned by the Postbank Management Board<br />

defines the strategy and framework for controlling operational risk. Day-to-day management of operational risk<br />

is the responsibility of the individual units within the Postbank. Strategic parameters for managing operational<br />

risk, both qualitative as well as quantitative, are part of the overall strategy.<br />

At Postbank the economic capital requirements for operational risk both for the Postbank as a whole and for<br />

the four business divisions individually have been determined using a standalone internal capital model to<br />

calculate capital requirements for operational risk. Postbank received the approval by the BaFin for their AMA<br />

in December 2010.<br />

Within the consolidation of Postbank the results of the economic capital requirements for operational risk have<br />

been recalculated using <strong>Deutsche</strong> <strong>Bank</strong>’s economic capital methodology for operational risk based upon pooled<br />

data from <strong>Deutsche</strong> <strong>Bank</strong> Group and Postbank and are reported in aggregate in section “Overall Risk Position”<br />

of this report.<br />

Liquidity Risk at <strong>Deutsche</strong> <strong>Bank</strong> Group (excluding Postbank)<br />

Liquidity risk management safeguards our ability to meet all payment obligations when they come due. Our<br />

liquidity risk management framework has been an important factor in maintaining adequate liquidity and in<br />

managing our funding profile during 2010.<br />

Liquidity Risk Management Framework<br />

The Management Board defines our liquidity risk strategy, and in particular our tolerance for liquidity risk based<br />

on recommendations made by Treasury and the Capital and Risk Committee. At least once every year the<br />

Management Board will review and approve the limits which are applied to the Group to measure and control<br />

liquidity risk as well as the <strong>Bank</strong>’s long-term funding and issuance plan.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!