BACnet Europe
BACnet Europe
BACnet Europe
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
AnwendungenSolutions<br />
Im Chemiepark Marl betreiben rund<br />
30 Unternehmen über 100 Produktionsanlagen.<br />
In the chemical park Marl about 30 businesses<br />
operate over 100 production facilities.<br />
am Leitrechner jeder nur seinen eigenen Teilbereich<br />
sehen und bearbeiten kann. Über<br />
PHWIN können die verschiedenen Betriebe<br />
über den eigenen Arbeitsplatzrechner kennwortgeschützt<br />
auf das Gebäudemanagementsystem<br />
zugreifen.<br />
Optimaler Kundenservice<br />
Der Chemiepark in Marl ist ein weiterer Beleg<br />
dafür, dass guter Service und moderne Technik<br />
Hand in Hand gehen. Mit dem maßgeschneiderten<br />
Gesamtpaket von Kieback&Peter kann die Infracor<br />
GmbH das Serviceangebot für ihre Kunden<br />
ständig weiter optimieren.<br />
The chemical park Marl on the northern-edge<br />
of the Ruhr is one of the biggest chemical<br />
parks in Germany. There are about 10,000<br />
workers spread over 6.5 km2 . About 30 businesses<br />
operate over 100 production facilities<br />
which total too around 900 buildings on site.<br />
The chemical park is networked via German<br />
railways, two highways, a harbor on the Wesel-<br />
Datteln and pipelines for raw materials and products<br />
with customers and suppliers.<br />
The operating company and service provider is<br />
Infracor GmbH, a subsidiary of Evonik Industries<br />
AG. The integration of all systems via <strong>BACnet</strong><br />
and a building management system Neutrino-<br />
GLT version 9 from Kieback&Peter enables both<br />
the operator and the tenants to always maintain<br />
an overview of the status of the building systems.<br />
Long term cooperation<br />
For over 30 years, Infracor and Kieback&Peter<br />
have worked in Marl with one another which has<br />
developed into a long-lasting and trusting-relationship.<br />
Through close contact with the various<br />
departments at the factory, it ensures that all<br />
challenges are being met to find optimal, common<br />
solutions.<br />
From analog islands to digital total solution<br />
The latest challenge was the gradual upgrading<br />
of existing facilities. Where previously analog<br />
island solutions were installed, today there is<br />
28<br />
<strong>BACnet</strong> <strong>Europe</strong> Journal1710/12<br />
a network-ready control system on the network<br />
location connected to the central BMS,<br />
so this building automation system is remotely<br />
operated under comfortable conditions, sample<br />
data and events can be observed and recorded.<br />
In order to obtain access, the requirements of<br />
the network operator Infracor had to be exact.<br />
In general, access to all buildings is connected<br />
inside and outside of the chemical park.<br />
The demands from the side of Infracor were selfevident<br />
because of the challenging scale of the<br />
project:<br />
The maintenance staff needs all the relevant<br />
information about all of their supervisory<br />
systems<br />
The customers can get remote access by<br />
demand to “their own” BCS facilities<br />
All customers’ equipment must be switched<br />
to a client-BCS<br />
The system must be open to the integration<br />
of external systems and other trades<br />
Thus Infracor GmbH is in a position to be able to<br />
expand their range of services: On the one hand,<br />
the maintenance technicians can respond independently<br />
to disruptions by the direct access to<br />
the clients systems. On the other hand, the customers<br />
can be offered the use of a BMS, without<br />
it they must acquire it themselves.<br />
Modern technology and powerful software<br />
The requirements were implemented with<br />
DDC4000 automation stations and BMR on the<br />
automation and management level, but also existing<br />
DDC3000 were integrated. DDC4000 automation<br />
system is equipped with <strong>BACnet</strong>, the automation<br />
stations are connected to the network via <strong>BACnet</strong>.<br />
At the management level air conditioning cabinets<br />
from Stulz are connected to the building management<br />
system. On the main level room thermostat<br />
and room control modules DDC110 are used.<br />
A Neutrino-GLT Version 9 is used, as a central<br />
building management system with the software<br />
module SM99 client-BCS. For each customer, a<br />
separate <strong>BACnet</strong> and network area is reserved, so<br />
that the host can see and handle any part of his<br />
own sub-area. About PHWIN the various companies<br />
on their own workstation password protected<br />
access to the building management system.<br />
Optimum customer service<br />
The Marl chemical park is further proof that good<br />
technology goes hand in hand with efficient service.<br />
With the tailored package of Kieback&Peter,<br />
Infracor GmbH is able to continuously optimize the<br />
service offered to its customers.<br />
DierkGroße<br />
Projekttechniker / Project technician<br />
Kieback&Peter GmbH & Co. KG | Niederlassung Ruhr<br />
grosse@kieback-peter.de.