Anwendungen­Solutions<br />

Im Chemiepark Marl betreiben rund<br />

30 Unternehmen über 100 Produktionsanlagen.<br />

In the chemical park Marl about 30 businesses<br />

operate over 100 production facilities.<br />

am Leitrechner jeder nur seinen eigenen Teilbereich<br />

sehen und bearbeiten kann. Über<br />

PHWIN können die verschiedenen Betriebe<br />

über den eigenen Arbeitsplatzrechner kennwortgeschützt<br />

auf das Gebäudemanagementsystem<br />

zugreifen.<br />

Optimaler Kundenservice<br />

Der Chemiepark in Marl ist ein weiterer Beleg<br />

dafür, dass guter Service und moderne Technik<br />

Hand in Hand gehen. Mit dem maßgeschneiderten<br />

Gesamtpaket von Kieback&Peter kann die Infracor<br />

GmbH das Serviceangebot für ihre Kunden<br />

ständig weiter optimieren.<br />

The chemical park Marl on the northern-edge<br />

of the Ruhr is one of the biggest chemical<br />

parks in Germany. There are about 10,000<br />

workers spread over 6.5 km2 . About 30 businesses<br />

operate over 100 production facilities<br />

which total too around 900 buildings on site.<br />

The chemical park is networked via German<br />

railways, two highways, a harbor on the Wesel-<br />

Datteln and pipelines for raw materials and products<br />

with customers and suppliers.<br />

The operating company and service provider is<br />

Infracor GmbH, a subsidiary of Evonik Industries<br />

AG. The integration of all systems via <strong>BACnet</strong><br />

and a building management system Neutrino-<br />

GLT version 9 from Kieback&Peter enables both<br />

the operator and the tenants to always maintain<br />

an overview of the status of the building systems.<br />

Long term co­operation<br />

For over 30 years, Infracor and Kieback&Peter<br />

have worked in Marl with one another which has<br />

developed into a long-lasting and trusting-relationship.<br />

Through close contact with the various<br />

departments at the factory, it ensures that all<br />

challenges are being met to find optimal, common<br />

solutions.<br />

From analog islands to digital total solution<br />

The latest challenge was the gradual upgrading<br />

of existing facilities. Where previously analog<br />

island solutions were installed, today there is<br />

28<br />

<strong>BACnet</strong> <strong>Europe</strong> Journal­17­10/12<br />

a network-ready control system on the network<br />

location connected to the central BMS,<br />

so this building automation system is remotely<br />

operated under comfortable conditions, sample<br />

data and events can be observed and recorded.<br />

In order to obtain access, the requirements of<br />

the network operator Infracor had to be exact.<br />

In general, access to all buildings is connected<br />

inside and outside of the chemical park.<br />

The demands from the side of Infracor were selfevident<br />

because of the challenging scale of the<br />

project:<br />

The maintenance staff needs all the relevant<br />

information about all of their supervisory<br />

systems<br />

The customers can get remote access by<br />

demand to “their own” BCS facilities<br />

All customers’ equipment must be switched<br />

to a client-BCS<br />

The system must be open to the integration<br />

of external systems and other trades<br />

Thus Infracor GmbH is in a position to be able to<br />

expand their range of services: On the one hand,<br />

the maintenance technicians can respond independently<br />

to disruptions by the direct access to<br />

the clients systems. On the other hand, the customers<br />

can be offered the use of a BMS, without<br />

it they must acquire it themselves.<br />

Modern technology and powerful software<br />

The requirements were implemented with<br />

DDC4000 automation stations and BMR on the<br />

automation and management level, but also existing<br />

DDC3000 were integrated. DDC4000 automation<br />

system is equipped with <strong>BACnet</strong>, the automation<br />

stations are connected to the network via <strong>BACnet</strong>.<br />

At the management level air conditioning cabinets<br />

from Stulz are connected to the building management<br />

system. On the main level room thermostat<br />

and room control modules DDC110 are used.<br />

A Neutrino-GLT Version 9 is used, as a central<br />

building management system with the software<br />

module SM99 client-BCS. For each customer, a<br />

separate <strong>BACnet</strong> and network area is reserved, so<br />

that the host can see and handle any part of his<br />

own sub-area. About PHWIN the various companies<br />

on their own workstation password protected<br />

access to the building management system.<br />

Optimum customer service<br />

The Marl chemical park is further proof that good<br />

technology goes hand in hand with efficient service.<br />

With the tailored package of Kieback&Peter,<br />

Infracor GmbH is able to continuously optimize the<br />

service offered to its customers.<br />

Dierk­Große<br />

Projekttechniker / Project technician<br />

Kieback&Peter GmbH & Co. KG | Niederlassung Ruhr<br />

grosse@kieback-peter.de.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!