<strong>Halifax</strong> Water Integrated Resource Plan<br />

Recommended IRP and Analysis<br />

Table 6.3<br />

Sensitivity of Treatment Expansion Requirements to Growth Rate<br />

Facility<br />

Current Capacity<br />

Current Flow/Demand<br />

(m 3 /d)<br />

Future Recommended<br />

IRP Capacity<br />

(m 3 /d)<br />

Future Baseline Growth<br />

Scenario Flow/ Demand<br />

(m 3 /d)<br />

Future High Growth<br />

Scenario Flow/ Demand<br />

(m 3 /d)<br />

Future Low Growth<br />

Scenario Flow/ Demand<br />

(m 3 /d)<br />

Facility Expansion<br />

Requirement<br />

Herring<br />

Cove<br />

WWTF<br />

28,512 12,500 80,500 80,500 ~102,00 ~70,000<br />

• Expansion required by 2031-<br />

2036 under baseline scenario<br />

• Future WWTF capacity would<br />

need to increase under high<br />

scenario. Current expansion<br />

timing would need to<br />

accelerate.<br />

• Future WWTF capacity would<br />

decrease under low scenario.<br />

Current expansion timing could<br />

be delayed.<br />

At this stage the updated HRM <strong>Regional</strong> Plan is still under formulation and the current<br />

planning projections are an extrapolated estimate. Once these planning estimates are<br />

confirmed the water and wastewater functional plans should be reviewed and updated<br />

as needed. The sensitivity of the plans to growth should be re-evaluated at this point.<br />

Revision: 2012-10-29 Integrated Resource Plan 89<br />