Recommended Alternative<br />

Resource Plan 40‐4<br />

The total 3‐year and 30‐year NPV for the recommended plan inclusive of capital and O&M costs<br />

are $345 million and $2,579 million, respectively.<br />

Annual Plan Expenditures<br />

The timing of expenditures (in $2012) for the recommended Alternative Resource Plan 40‐4 is<br />

shown in the top figure presented on the previous page, which indicates significant<br />

expenditures around years 10, 20 and 30. This corresponds to the following projects:<br />

<br />

<br />

<br />

Year 10 – WWTF Nutrient Upgrades.<br />

Year 20 – WSER HHSP WWTF Upgrades.<br />

Year 30 – Enhanced Overflow Control Program.<br />

Over the 30‐year period the average expenditure under the Recommended Alternative<br />

Resource Plan is $131 million/yr.<br />

Expenditure by Driver<br />

The IRP responds to the combined requirements of regional growth, present and expected<br />

regulatory compliance and asset renewal.<br />

The expenditures by driver for the recommended Alternative Resource Plan 40‐4 are shown in<br />

the bottom left Figure presented on the previous page. Approximately 54% or $1,385.1 of the<br />

expenditures including O&M costs are associated with asset renewal and the remainder split<br />

between growth (23% or $598.4) and compliance (23% or $595.2) for the water, wastewater<br />

and stormwater systems.<br />

Water, Wastewater, and Stormwater Cost Breakdown (NPV)<br />

The expenditures for the individual water, wastewater, and stormwater systems, as per the<br />

recommended Alternative Resource Plan 40‐4, are shown in the bottom right Table presented on the<br />

previous page. The expenditures are divided into the objectives described below and are inclusive of<br />

O&M costs.<br />

Fourteen specific objectives were elaborated for the three drivers. The objectives reflect the current and<br />

anticipated compliance requirements (seven objectives) for the infrastructure systems (Objectives 1<br />

through 7); optimal asset renewal requirements as well as a number of related issues addressing water<br />

and wastewater system reliability, adequate stormwater capacity, adaptability to climate change and<br />

energy efficiency (Objectives 8 through 12); and two growth related objectives addressing the need to<br />

extend regional level servicing requirements and the requirement to manage flow capacity allocations<br />

(Objectives 13 and 14). Specific projects and programs were allocated to each objective in the financial<br />

plan from existing <strong>Halifax</strong> Water initiatives and new program initiatives identifying the long‐term<br />

servicing needs of <strong>Halifax</strong> Water’s infrastructure.<br />

October 31 2012 Page 239 of 272