<strong>Halifax</strong> Water Integrated Resource Plan<br />

Integrated Resource Plan Development and Evaluation<br />

IRP Driver<br />

The IRP expenditures by driver for fully A, B and C plans with enhanced overflow control<br />

and the RWWFP (Plans 25-1, 28-1, 22-1 respectively) are presented in Figure 5.3. Asset<br />

renewal expenditures dominate. Total asset renewal program costs range from $1,801<br />

million to $992 million for the thirty-year period. This corresponds to 60% of the<br />

expenditures associated with Level A, 55% for Level B and 49% for Level C.<br />

The growth and compliance related expenditures show less variation in moving from the<br />

A to B to C levels.<br />

Figure 5.3<br />

IRP Expenditure by Driver<br />

RWWFP and Modified RWWFP for WWTF Nutrient Control<br />

Comparison of the plans in Bundles 1 and 3 shows an approximately $19 million<br />

difference in 30-year NPV ($23 million in $2012 as per Table 5.3) associated with the<br />

two nutrient reduction strategies for WWTFs discharging to limited receiving waters<br />

(Modified RWWFP versus RWWFP). The Modified RWWFP (upgrading all 9 WWTFs plus<br />

BLT upgrade already under way) is the less expensive of the two alternatives. It has<br />

however the disadvantage that the discharges, although upgraded, are still maintained<br />

into the Nine Mile River from BLT WWTF and Lisle Lake from Springfield Lake WWTF.<br />

This is a less sustainable alternative. The IRP analysis of the costs of the nutrient<br />

reduction alternatives was carried out at a high level and the cost difference will likely<br />

shrink with a more detailed evaluation. Consequently, for purposes of further plan<br />

evaluation the Modified RWWFP option was abandoned eliminating Plans 1-1 to 14-1<br />

(Bundles 1 and 2) from further consideration and concentrating the analysis on Plans 15-<br />

1 to 28-1 (Bundles 3 and 4).<br />

Revision: 2012-10-29 Integrated Resource Plan 64<br />

October 31 2012 Page 97 of 272