<strong>Halifax</strong> Water Integrated Resource Plan<br />

Appendices<br />

• The current annual expenditure as a percentage of the asset value was based on the<br />

asset renewal expenditures provided in the Five-Year Capital for 2012 to 2017. It was<br />

assumed that the budgeted amounts are indicative of current asset renewal<br />

expenditures.<br />

• Some special assets with significant site-specific conditions affecting renewal costs<br />

such as reservoirs or dams were not modelled but rather subjected to individual<br />

analysis to estimate required renewal over the 30-year period. These were high-level<br />

estimates. Specific detailed evaluations should be made for each of these structures<br />

to establish current condition and replacement requirements.<br />

Based on the below, Table 2.1 shows the following:<br />

• The range of total water asset renewal 30-year NPV costs is from approximately<br />

$581 million for A level water system renewal to $312 million for C level renewal.<br />

This corresponds to near doubling (1.9 x) of costs in moving from C level to A level<br />

• Approximately 25% -30% of costs are associated with WSP renewal activity<br />

depending on the level of renewal.<br />

• Approximately 42% -53 % of costs are associated with linear assets (i.e. distribution<br />

and transmission mains) depending on level of renewal.<br />

• The modelled renewal rates significantly exceed the current renewal rates shown in<br />

the Five-Year Capital Plan for complex facilities such as WSPs, pumping stations,<br />

valves and pressure reducing valves (PRVs).<br />

• Current renewal rates for distribution mains are less than C level while current rates<br />

for transmission mains fall between B level and A level.<br />

• Current renewal for metering significantly exceeds modelled rates at all levels.<br />

As noted below, the asset renewal modeling used some simple rules based on asset age.<br />

For purposes of evaluating asset renewal effectiveness, two metrics were employed –<br />

average asset life at the end-of-period and the fraction of assets above design life.<br />

Revision: 2012-10-29 Integrated Resource Plan –Appendices F-9<br />

October 31 2012 Page 188 of 272