volume 1 - Halifax Regional Municipality
volume 1 - Halifax Regional Municipality
volume 1 - Halifax Regional Municipality
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Halifax</strong> Water Integrated Resource Plan<br />
IRP Implementation Plan<br />
The updated/expanded LOS once developed will require support for LOS monitoring,<br />
data analysis and reporting. <strong>Halifax</strong> Water will need to consider the impact on operating<br />
staff for this additional data collection, analysis, and reporting.<br />
In a number of cases, no change or addition to the LOS have been recommended.<br />
Table 7.7<br />
Recommended LOS Updates or Additions<br />
Driver Objective Proposed LOS Update or Addition<br />
Compliance<br />
Asset<br />
Renewal<br />
Growth<br />
1. Meet Current Nova Scotia Environment<br />
WWTF Permits to Operate<br />
2. Meet Current Nova Scotia Environment<br />
WSP Permits to Operate<br />
3. Meet Current Overflow Compliance<br />
4. Meet Future WWTF Compliance<br />
5. Meet Future Drinking Water<br />
Compliance<br />
6. Meet Future Overflow Compliance<br />
7. Meet Future Stormwater Quality<br />
Compliance<br />
8. Implement Optimal Level of Asset<br />
Renewal<br />
9. Enhance the Reliability of Critical Water<br />
and Wastewater Assets<br />
10. Ensure Existing Stormwater System<br />
Adequately Sized for Minor Storm<br />
Conveyance<br />
11. Adapt to Future Climate Change<br />
12. Reduce Energy Consumption, Operating<br />
Costs and Greenhouse Gas<br />
Contributions<br />
13. Provide <strong>Regional</strong> Water, Wastewater<br />
and Stormwater Infrastructure Needed<br />
to Support Planned Growth<br />
14. Manage Flow Capacity Allocations<br />
• Update to include additional compliance<br />
parameters associated with new programs e.g.<br />
nutrient control.<br />
• Review percentage compliance criteria.<br />
• Update to include any additional compliance<br />
parameters.<br />
• Develop frequency and <strong>volume</strong> targets for<br />
RWWFP overflows.<br />
• See Objective 1 for LOS.<br />
• See Objective 2 for LOS.<br />
• Develop frequency and <strong>volume</strong> targets for long<br />
term overflow program.<br />
• May require updated LOS for site specific<br />
overflow frequency and <strong>volume</strong> targets, e.g. NW<br />
Arm.<br />
• Consider preliminary stormwater quality<br />
monitoring LOS, e.g. number samples/sites.<br />
• Develop specific asset renewal targets and LOS.<br />
This will require a new monitoring system to<br />
provide reporting on progress.<br />
• No changes suggested.<br />
• Develop specific pipe and culvert capacity LOS.<br />
• At a minimum apply customer satisfaction LOS.<br />
• Incorporate future climate change impacts into<br />
existing LOS where appropriate.<br />
• Consider specific energy reduction targets and<br />
incorporate into more detailed LOS.<br />
• No changes suggested.<br />
• Develop specific targets for I/I reduction at<br />
WWTFs and in major pumping stations and other<br />
locations, e.g. overflows.<br />
• Consider water demand targets.<br />
Revision: 2012-10-29 Integrated Resource Plan 101<br />
October 31 2012 Page 134 of 272