05.01.2014 Views

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Halifax</strong> Water Integrated Resource Plan<br />

IRP Implementation Plan<br />

The updated/expanded LOS once developed will require support for LOS monitoring,<br />

data analysis and reporting. <strong>Halifax</strong> Water will need to consider the impact on operating<br />

staff for this additional data collection, analysis, and reporting.<br />

In a number of cases, no change or addition to the LOS have been recommended.<br />

Table 7.7<br />

Recommended LOS Updates or Additions<br />

Driver Objective Proposed LOS Update or Addition<br />

Compliance<br />

Asset<br />

Renewal<br />

Growth<br />

1. Meet Current Nova Scotia Environment<br />

WWTF Permits to Operate<br />

2. Meet Current Nova Scotia Environment<br />

WSP Permits to Operate<br />

3. Meet Current Overflow Compliance<br />

4. Meet Future WWTF Compliance<br />

5. Meet Future Drinking Water<br />

Compliance<br />

6. Meet Future Overflow Compliance<br />

7. Meet Future Stormwater Quality<br />

Compliance<br />

8. Implement Optimal Level of Asset<br />

Renewal<br />

9. Enhance the Reliability of Critical Water<br />

and Wastewater Assets<br />

10. Ensure Existing Stormwater System<br />

Adequately Sized for Minor Storm<br />

Conveyance<br />

11. Adapt to Future Climate Change<br />

12. Reduce Energy Consumption, Operating<br />

Costs and Greenhouse Gas<br />

Contributions<br />

13. Provide <strong>Regional</strong> Water, Wastewater<br />

and Stormwater Infrastructure Needed<br />

to Support Planned Growth<br />

14. Manage Flow Capacity Allocations<br />

• Update to include additional compliance<br />

parameters associated with new programs e.g.<br />

nutrient control.<br />

• Review percentage compliance criteria.<br />

• Update to include any additional compliance<br />

parameters.<br />

• Develop frequency and <strong>volume</strong> targets for<br />

RWWFP overflows.<br />

• See Objective 1 for LOS.<br />

• See Objective 2 for LOS.<br />

• Develop frequency and <strong>volume</strong> targets for long<br />

term overflow program.<br />

• May require updated LOS for site specific<br />

overflow frequency and <strong>volume</strong> targets, e.g. NW<br />

Arm.<br />

• Consider preliminary stormwater quality<br />

monitoring LOS, e.g. number samples/sites.<br />

• Develop specific asset renewal targets and LOS.<br />

This will require a new monitoring system to<br />

provide reporting on progress.<br />

• No changes suggested.<br />

• Develop specific pipe and culvert capacity LOS.<br />

• At a minimum apply customer satisfaction LOS.<br />

• Incorporate future climate change impacts into<br />

existing LOS where appropriate.<br />

• Consider specific energy reduction targets and<br />

incorporate into more detailed LOS.<br />

• No changes suggested.<br />

• Develop specific targets for I/I reduction at<br />

WWTFs and in major pumping stations and other<br />

locations, e.g. overflows.<br />

• Consider water demand targets.<br />

Revision: 2012-10-29 Integrated Resource Plan 101<br />

October 31 2012 Page 134 of 272

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!