<strong>Halifax</strong> Water Integrated Resource Plan<br />

Executive Summary<br />

ES 6.<br />

ES 6.1<br />

ES 6.2<br />

PROGRAMS AND PROJECTS<br />

Existing <strong>Halifax</strong> Water projects and programs as well as new or refined programs and<br />

projects proposed through the IRP process were key ingredients in the preparation of<br />

the alternative IRP plans.<br />

Existing Programs and Projects<br />

The existing projects and programs included in the IRP were obtained from three<br />

principal sources.<br />

The <strong>Halifax</strong> Water Five-Year Business Plan 8 , which provided a projected Five-Year Capital<br />

Plan for the period 2012 to 2017, was the first source. Since the FY 2012 - 2013 was already<br />

underway during the preparation of the IRP, only the final four years were included at a<br />

value of approximately $200 million. The individual projects were programmed into the IRP<br />

with the same timing as in the original Five-Year Capital Plan.<br />

Projects, which in many cases were continuations of programs and projects initiated in<br />

the Five-Year Business Plan period, were allocated to 2018 and beyond. This included<br />

about $410 million in additional projects that were further refined through the IRP as to<br />

both capital requirement and timing.<br />

The recently completed draft <strong>Regional</strong> Wastewater Functional Plan (RWWFP) 9 with an<br />

estimated cost of $645 million was also incorporated into the IRP. The RWWFP provides<br />

<strong>Halifax</strong> Water with a wastewater servicing plan addressing both the needs for future<br />

growth and offsetting the impact of growth on wastewater overflows. The RWWFP<br />

examined a wide range of alternatives settling on a regionalized wastewater strategy.<br />

The projects originating in the RWWFP were incorporated into the IRP with the same<br />

timing and capital requirement as the RWWFP.<br />

New or Refined Programs<br />

In addition to the existing programs and projects, a number of new projects and<br />

programs were developed. As well, some of the existing programs were refined through<br />

the work performed during the preparation of the IRP and incorporated into the<br />

alternative IRP plans. Table ES-3 summarizes these programs.<br />

2<br />

<strong>Halifax</strong> Water Five-Year Business Plan 2012-2013 to 2016-2017, <strong>Halifax</strong> Water,<br />

December 2011<br />

3<br />

<strong>Regional</strong> Wastewater Functional Plan, <strong>Halifax</strong> Water, June 2012<br />

Revision: 2012-10-29 Integrated Resource Plan – Executive Summary ES-11<br />

October 31 2012 Page 13 of 272