<strong>Halifax</strong> Water Integrated Resource Plan<br />

Appendices<br />

Table 2.12<br />

Proposed Transmission Main Projects<br />

Project<br />

Length<br />

(m)<br />

Diameter<br />

(mm)<br />

Description<br />

Project<br />

Cost<br />

$ million<br />

(2012 $)<br />

In-Service<br />

Date<br />

W3 1,050 900<br />

North End Feeder Tunnel 36" Transmission<br />

Main Rehab<br />

$2.92 2017<br />

W4 4,035 600 Peninsula Low 24" Transmission Main Sliplining $7.69 2027<br />

W5 4,035 375<br />

Peninsula Intermediate 15" Transmission Main<br />

Sliplining<br />

$6.60 2022<br />

W6 6,120 675 Peninsula Low 27" Transmission Main Sliplining $14.63 2032<br />

W7 2,610 400 Herring Cove Transmission Main Replacement $4.27 2022<br />

W8 1<br />

Mainland North Booster Pumping Station to Fill<br />

Geizer 158<br />

$1.00 2037<br />

W9 5,100 750 Susie Lake Transmission Main $12.89 2027<br />

Sub-Total West Region $61.71<br />

Total Capital $141.76<br />

Revision: 2012-10-29 Integrated Resource Plan –Appendices F-31<br />

October 31 2012 Page 210 of 272