<strong>Halifax</strong> Water Integrated Resource Plan<br />

Executive Summary<br />

associated with the proposed enhanced asset renewal program. The remainder consists<br />

of additional projects and programs with an approximate value of $128 million.<br />

Asset renewal estimates, originating from the asset renewal model, project an expected<br />

level of investment for asset renewal based on a range of assumptions. These values,<br />

however, do not imply a level of understanding of where specifically the expenditures<br />

are required. A significant amount of additional effort will be required to identify the<br />

specific asset renewal priorities including implementing the Asset Management<br />

Assessment program (“roadmap”) and a number of activities related to asset inventory<br />

and condition assessment.<br />

This increase in expenditure levels for the three-year period will be challenging. Major<br />

capital projects are already underway to varying degrees, as are a number of the other<br />

infrastructure projects. Any flexibility in timing and required expenditure would likely be<br />

associated with overall asset renewal and some of the other programs. The updated<br />

AMA program outlined in the “roadmap” is still emerging and currently relies on <strong>Halifax</strong><br />

Water’s existing available resources. Even with accelerated implementation, it will<br />

require at least 2 to 3 years to have adequate data and systems in place to obtain strong<br />

returns from scaled-up asset renewal expenditures.<br />

The three-year outlook will be in large measure determined by funding availability. It<br />

expected that the <strong>Halifax</strong> Water capital planning process would determine the<br />

project/program priorities once funding levels have been established.<br />

ES 8.4<br />

Recommended IRP Implementation Schedule<br />

The master IRP schedule is presented in Figure ES-5. The figure is organized around the<br />

drivers and objectives for each of the three systems. Specific projects are indicated in<br />

the timeline as well as on-going programs. The overall plan spans the period 2013 to<br />

2043.<br />

Revision: 2012-10-29 Integrated Resource Plan – Executive Summary ES-18<br />