<strong>Halifax</strong> Water Integrated Resource Plan<br />

IRP Planning Context and Levels of Service<br />

3.5 FIVE-YEAR BUSINESS PLAN AND CAPITAL BUDGET<br />

<strong>Halifax</strong> Water prepared a Five-Year Business Plan 19 in December of 2011. This plan was<br />

developed to support the December 2011 rate application for the urban core/satellite<br />

systems, a January 2012 rate application for the Airport/Aerotech system, and to<br />

provide a comprehensive financial plan for <strong>Halifax</strong> Water. From the perspective of the<br />

IRP, the Five-Year Business Plan contains the Five-Year Capital Plan, which defines the<br />

specific projects and programs prepared by <strong>Halifax</strong> Water and accepted (first year) by<br />

the NSUARB. These projects and programs were incorporated in the alternative IRP<br />

resource plans. The projects and programs included in the Five-Year Capital Plan address<br />

the full range of IRP drivers and were accordingly allocated to the appropriate IRP<br />

objectives described in Section 5.<br />

Since the FY 2012 -2013 was already underway during the preparation of the IRP, only<br />

the final four years were included at a value of approximately $200 million. The<br />

individual projects were programmed into the IRP with the same timing as in the<br />

original Five-Year Capital Budget.<br />

Projects, which in many cases were continuations of programs and projects initiated in<br />

the Five-Year Capital Plan, were allocated as appropriate to 2018 and beyond. This<br />

included about $410 million in additional projects which were further refined through<br />

the IRP as to both capital requirement and timing. These projects should be reviewed as<br />

part of translating the IRP into the next Five-Year Capital Plan.<br />

Table 3.9 summarizes the capital budget for years 2013-2017. The details of the projects<br />

and programs for the Five-Year Capital Plan are presented in Volume 1 Appendix B. The<br />

long-term capital projects outside the Five-Year Capital Plan were also incorporated into<br />

the IRP following review and refinement.<br />

Table 3.9<br />

<strong>Halifax</strong> Water 2013 – 2017 Capital Plan<br />

Y2 Y3 Y4 Y5 Y2 –Y5 Sub-<br />

Total<br />

2013 -2014 2014-2015 2015 -2016 2016 -2017 2013-2017<br />

Stormwater Sub-Total $2.2 $2.8 $2.4 $3.8 $11.2<br />

Wastewater Sub-Total $75.6 $32.9 $14.5 $15.1 $138.1<br />

Water Sub-Total $12.9 $14.0 $13.1 $11.3 $51.3<br />

Totals $90.7 $49.7 $30.0 $30.2 $200.6<br />

19 <strong>Halifax</strong> Water Five-Year Business Plan 2012-2013 to 2016-2017, <strong>Halifax</strong> Water,<br />

December 2011<br />

Revision: 2012-10-29 Integrated Resource Plan 29<br />

October 31 2012 Page 62 of 272