<strong>Halifax</strong> Water Integrated Resource Plan<br />
IRP Planning Context and Levels of Service<br />
3.5 FIVE-YEAR BUSINESS PLAN AND CAPITAL BUDGET<br />
<strong>Halifax</strong> Water prepared a Five-Year Business Plan 19 in December of 2011. This plan was<br />
developed to support the December 2011 rate application for the urban core/satellite<br />
systems, a January 2012 rate application for the Airport/Aerotech system, and to<br />
provide a comprehensive financial plan for <strong>Halifax</strong> Water. From the perspective of the<br />
IRP, the Five-Year Business Plan contains the Five-Year Capital Plan, which defines the<br />
specific projects and programs prepared by <strong>Halifax</strong> Water and accepted (first year) by<br />
the NSUARB. These projects and programs were incorporated in the alternative IRP<br />
resource plans. The projects and programs included in the Five-Year Capital Plan address<br />
the full range of IRP drivers and were accordingly allocated to the appropriate IRP<br />
objectives described in Section 5.<br />
Since the FY 2012 -2013 was already underway during the preparation of the IRP, only<br />
the final four years were included at a value of approximately $200 million. The<br />
individual projects were programmed into the IRP with the same timing as in the<br />
original Five-Year Capital Budget.<br />
Projects, which in many cases were continuations of programs and projects initiated in<br />
the Five-Year Capital Plan, were allocated as appropriate to 2018 and beyond. This<br />
included about $410 million in additional projects which were further refined through<br />
the IRP as to both capital requirement and timing. These projects should be reviewed as<br />
part of translating the IRP into the next Five-Year Capital Plan.<br />
Table 3.9 summarizes the capital budget for years 2013-2017. The details of the projects<br />
and programs for the Five-Year Capital Plan are presented in Volume 1 Appendix B. The<br />
long-term capital projects outside the Five-Year Capital Plan were also incorporated into<br />
the IRP following review and refinement.<br />
Table 3.9<br />
<strong>Halifax</strong> Water 2013 – 2017 Capital Plan<br />
Y2 Y3 Y4 Y5 Y2 –Y5 Sub-<br />
Total<br />
2013 -2014 2014-2015 2015 -2016 2016 -2017 2013-2017<br />
Stormwater Sub-Total $2.2 $2.8 $2.4 $3.8 $11.2<br />
Wastewater Sub-Total $75.6 $32.9 $14.5 $15.1 $138.1<br />
Water Sub-Total $12.9 $14.0 $13.1 $11.3 $51.3<br />
Totals $90.7 $49.7 $30.0 $30.2 $200.6<br />
19 <strong>Halifax</strong> Water Five-Year Business Plan 2012-2013 to 2016-2017, <strong>Halifax</strong> Water,<br />
December 2011<br />
Revision: 2012-10-29 Integrated Resource Plan 29<br />
October 31 2012 Page 62 of 272