<strong>Halifax</strong> Water Integrated Resource Plan<br />
IRP Implementation Plan<br />
Under the Recommended IRP, proposed expenditures would be about $1,427 million in<br />
the 2023 to 2032 period and $1,143 million in the period 2033 to 2043 or average<br />
expenditures of about $142 million/yr. and $114 million/yr. respectively.<br />
Approximately $1,125 million of the total in the Recommended IRP 2023 to 2032 budget<br />
is associated with wastewater projects including the WSER mandated $286.9 million<br />
harbour facility upgrades to secondary treatment, Eastern Passage sewer system<br />
improvements, and implementation of a number of RWWFP projects. The wastewater<br />
capital program for 2033 to 2043 is about $716 million. The major wastewater project<br />
occurs at the end of this period with the $173 million Enhanced Overflow Control<br />
Program.<br />
The 2023 to 2032 water infrastructure budget is $231.2 million and the 2033 to 2043<br />
budget is $293 million. Major projects include transmission upgrades for capacity and<br />
system security enhancement, additional/upgraded storage facilities. The storm system<br />
has expenditures of $43.3 million and $105.6 million in the two ten year periods. The<br />
projects are associated with pipe replacement. The relatively low investment in storm<br />
system projects reflects the physically limited nature of the system and the relatively<br />
young age. It probably also reflects the lack of knowledge regarding system conditions<br />
and capacities and as additional asset information is gathered, it is anticipated that<br />
investment requirements for the storm system will increase.<br />
Table 7.4 Recommended IRP Expenditures 2023 - 2032 and 2033 - 2043<br />
($2012 million)<br />
Category FY 2023 -2032 FY 2033 -2043<br />
Water $231.2 $293<br />
Wastewater $1,124.7 $716.6<br />
Stormwater $43.3 $105.6<br />
Enterprise Programs (1) $28.3 $28.3<br />
Total Expenditure $1,427.5 $1,143.5<br />
Notes:<br />
1. Enterprise Programs refers to <strong>Halifax</strong> Water wide programs such as the SCADA Master Plan, the AMA Program<br />
and the IRP among others.<br />
Revision: 2012-10-29 Integrated Resource Plan 94<br />