<strong>Halifax</strong> Water Integrated Resource Plan<br />
Integrated Resource Plan Development and Evaluation<br />
Table 5.4<br />
Initial Alternative Resource Plan Variations<br />
Driver<br />
Objective<br />
Infrastructure<br />
System<br />
Variation<br />
Three levels asset renewal were considered for<br />
point assets<br />
A – 0.8 x asset life<br />
8. Implement Optimal Level<br />
of Asset Renewal<br />
Water,<br />
Wastewater,<br />
Stormwater<br />
B – 1.0 x asset life<br />
C – 1.2 x asset life<br />
Three levels of asset renewal were considered<br />
for linear assets<br />
A – Decreasing average asset life over period<br />
B – No change in average asset life over period<br />
C – Increasing average asset life over period<br />
Asset<br />
Renewal<br />
9. Enhance the Reliability<br />
of Critical Water and<br />
Wastewater Assets<br />
Water,<br />
Wastewater<br />
Time frame to implement water system security<br />
program is based on Five-Year Capital Plan<br />
modified through the IRP<br />
10. Ensure Existing<br />
Stormwater System<br />
Adequately Sized for<br />
Minor Storm<br />
Conveyance<br />
Stormwater<br />
Implementation timing of 10 years is for<br />
stormwater capacity evaluation program<br />
development<br />
11. Adapt to Future Climate<br />
Change<br />
Water,<br />
Wastewater,<br />
Stormwater<br />
Implementation timing of 3 years is for HW<br />
climate change program development<br />
12. Reduce Energy<br />
Consumption, Operating<br />
Costs and Greenhouse<br />
Gas Contributions<br />
Water,<br />
Wastewater<br />
Time frame to implement energy reduction<br />
projects is based on the Energy Management<br />
Plan as presented in the Five-Year Capital Plan<br />
Growth<br />
13. Provide <strong>Regional</strong> Water,<br />
Wastewater and<br />
Stormwater<br />
Infrastructure Needed to<br />
Support Planned Growth<br />
Water,<br />
Wastewater,<br />
Stormwater<br />
Timing for wastewater projects/programs as per<br />
RWWFP designed to meet demands of baseline<br />
growth; timing for water projects/programs as<br />
laid out in IRP Financial Model; no regional level<br />
stormwater projects/programs are anticipated<br />
for growth<br />
14. Manage Flow Capacity<br />
Allocations<br />
Water,<br />
Wastewater<br />
Timing as per RWWFP designed to manage<br />
demands of baseline growth<br />
Revision: 2012-10-29 Integrated Resource Plan 61<br />
October 31 2012 Page 94 of 272