<strong>Halifax</strong> Water Integrated Resource Plan<br />

Integrated Resource Plan Development and Evaluation<br />

Table 5.4<br />

Initial Alternative Resource Plan Variations<br />

Driver<br />

Objective<br />

Infrastructure<br />

System<br />

Variation<br />

Three levels asset renewal were considered for<br />

point assets<br />

A – 0.8 x asset life<br />

8. Implement Optimal Level<br />

of Asset Renewal<br />

Water,<br />

Wastewater,<br />

Stormwater<br />

B – 1.0 x asset life<br />

C – 1.2 x asset life<br />

Three levels of asset renewal were considered<br />

for linear assets<br />

A – Decreasing average asset life over period<br />

B – No change in average asset life over period<br />

C – Increasing average asset life over period<br />

Asset<br />

Renewal<br />

9. Enhance the Reliability<br />

of Critical Water and<br />

Wastewater Assets<br />

Water,<br />

Wastewater<br />

Time frame to implement water system security<br />

program is based on Five-Year Capital Plan<br />

modified through the IRP<br />

10. Ensure Existing<br />

Stormwater System<br />

Adequately Sized for<br />

Minor Storm<br />

Conveyance<br />

Stormwater<br />

Implementation timing of 10 years is for<br />

stormwater capacity evaluation program<br />

development<br />

11. Adapt to Future Climate<br />

Change<br />

Water,<br />

Wastewater,<br />

Stormwater<br />

Implementation timing of 3 years is for HW<br />

climate change program development<br />

12. Reduce Energy<br />

Consumption, Operating<br />

Costs and Greenhouse<br />

Gas Contributions<br />

Water,<br />

Wastewater<br />

Time frame to implement energy reduction<br />

projects is based on the Energy Management<br />

Plan as presented in the Five-Year Capital Plan<br />

Growth<br />

13. Provide <strong>Regional</strong> Water,<br />

Wastewater and<br />

Stormwater<br />

Infrastructure Needed to<br />

Support Planned Growth<br />

Water,<br />

Wastewater,<br />

Stormwater<br />

Timing for wastewater projects/programs as per<br />

RWWFP designed to meet demands of baseline<br />

growth; timing for water projects/programs as<br />

laid out in IRP Financial Model; no regional level<br />

stormwater projects/programs are anticipated<br />

for growth<br />

14. Manage Flow Capacity<br />

Allocations<br />

Water,<br />

Wastewater<br />

Timing as per RWWFP designed to manage<br />

demands of baseline growth<br />

Revision: 2012-10-29 Integrated Resource Plan 61<br />

October 31 2012 Page 94 of 272