05.01.2014 Views

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

volume 1 - Halifax Regional Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Halifax</strong> Water Integrated Resource Plan<br />

Integrated Resource Planning<br />

<strong>Halifax</strong> Water has a talented and highly professional staff with demonstrated capacity to<br />

adapt to changing circumstances. An adaptive management approach will certainly be<br />

needed as changing regulations, growth estimates and new information about asset<br />

condition and performance is considered. The recommended IRP should therefore be<br />

considered the first step in an on-going and evolving process of continuous<br />

improvement.<br />

The IRP represents an important component of <strong>Halifax</strong> Water’s financial planning. It<br />

feeds into subsequent studies that examine debt requirements to meet capital<br />

programs and into utility ratemaking. It was not designed to undertake the analysis of<br />

debt or rates within the IRP project activities. Rather the focus of the IRP preparation<br />

was as follows:<br />

• Capital and additional O&M costs to meet the program and project requirements of<br />

the Recommended IRP for the 30-year planning period from 2013 to 2043<br />

• Development of an overall planning framework integrating the IRP into <strong>Halifax</strong><br />

Water’s business processes<br />

• Identification of institutional constraints required to implement the Recommended<br />

IRP<br />

• Recommendations for additions and refinements of <strong>Halifax</strong> water’s Levels of Service<br />

(LOS) to facilitate the measurement of program success.<br />

The IRP is presented in three <strong>volume</strong>s as follows:<br />

• Volume 1 – <strong>Halifax</strong> Water Integrated Resource Plan, 2013-2043<br />

• Volume 2 – Stakeholder Consultation Record<br />

• Volume 3 – Technical Appendices<br />

Volume 1 is as follows:<br />

• Executive Summary<br />

• Section 1 – Overview of the IRP process and the contents of the IRP Report<br />

• Section 2 – Technical conferences and consultation summary<br />

• Section 3 – IRP planning context including institutional context, existing<br />

infrastructure and definition of existing levels of service<br />

• Section 4 – IRP Drivers including growth, asset renewal and regulatory compliance<br />

• Section 5 – IRP alternative resource plan formulation and evaluation including,<br />

development of IRP objectives, an overview of current and proposed programs and<br />

projects and selection of the Recommended IRP<br />

• Section 6 – Recommended IRP presenting details of the plan and examining the<br />

sensitivity of the plan to demand reduction and growth assumptions<br />

Revision: 2012-10-29 Integrated Resource Plan 3<br />

October 31 2012 Page 36 of 272

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!