Statement Concerning <strong>Halifax</strong> Water IRP – Tellus Institute Team<br />
Results from this effort are needed prior to commitment of major capital resources to<br />
accommodate growth.<br />
<strong>Halifax</strong> Water has acknowledged several other important uncertainties and/or data gaps (e.g.,<br />
stormwater quality assessment, climate change vulnerability assessment and adaptation plan,<br />
fiscal impact assessment, as well as the <strong>Regional</strong> Stormwater Functional Plan being conducted<br />
by HRM). These limitations need to be addressed to ensure HW’s planning is comprehensive<br />
and fully integrated, provides robust strategies for cost effectively meeting its service<br />
requirements, and the benefits of the IRP are realized to the maximum extent possible.<br />
While HW’s initial IRP utilizes the best available information and does a credible job in<br />
addressing the purposes identified by the Board in its call for an IRP, 1 it does not fully meet them<br />
due to the lack of certain critical information described above. In particular, the initial IRP does<br />
not provide the Board with adequate information required to make informed decisions about<br />
specific major future capital programs. Thus, the results of the IRP should be considered<br />
provisional, not final, and subject to modification as the additional information required is<br />
developed and the Recommended Plan is modified as appropriate. HW recognizes these<br />
limitations in the introductory section of the IRP in its call for an adaptive management<br />
approach.<br />
Based on the IRP results and Recommended Plan, HW prepared a short-term implementation<br />
plan covering the period 2013-2015. HW’s implementation plan for this three-year period<br />
identifies expenditure levels far greater than existing levels and more than double of those in the<br />
current Five-Year Capital Plan for this three-year period. At the same time HW indicates that<br />
any significant increase in expenditure levels above the spending identified in the Five-Year<br />
Capital Plan for this three-year period is likely unrealistic from the viewpoint of the increased<br />
revenue required as well as <strong>Halifax</strong> Water institutional capacity. Thus, in addition to the<br />
technical analyses required to fill in data gaps, there is also a need for an institutional capacity<br />
assessment.<br />
We acknowledge that the wastewater system in particular requires significant new investment for<br />
system repair, upgrade, and renewal. However, we take no position on the specific expenditure<br />
levels identified in the implementation plan for 2013-2015. The results of HW’s initial IRP have<br />
identified several key data gaps and uncertainties and HW has proposed several programs to<br />
address these.<br />
Recommendations Going Forward<br />
HW’s immediate priority should be to refine and detail an Action Plan, including milestones and<br />
a schedule, for conducting the programs it has proposed to fill the identified information gaps<br />
1 The purposes outlined in the UARB December 2010 decision were: to provide a framework for <strong>Halifax</strong> Water to<br />
evaluate alternative planning scenarios for its water, wastewater and stormwater services in an integrated fashion;<br />
to provide long-term direction for HW; to serve as an umbrella for which more detailed, facility- or programspecific<br />
capital investment analyses; to identify and plan for risks; and to provide the Board with the information<br />
and context it needs to make more fully informed decisions.<br />