Statement Concerning <strong>Halifax</strong> Water IRP – Tellus Institute Team<br />

Results from this effort are needed prior to commitment of major capital resources to<br />

accommodate growth.<br />

<strong>Halifax</strong> Water has acknowledged several other important uncertainties and/or data gaps (e.g.,<br />

stormwater quality assessment, climate change vulnerability assessment and adaptation plan,<br />

fiscal impact assessment, as well as the <strong>Regional</strong> Stormwater Functional Plan being conducted<br />

by HRM). These limitations need to be addressed to ensure HW’s planning is comprehensive<br />

and fully integrated, provides robust strategies for cost effectively meeting its service<br />

requirements, and the benefits of the IRP are realized to the maximum extent possible.<br />

While HW’s initial IRP utilizes the best available information and does a credible job in<br />

addressing the purposes identified by the Board in its call for an IRP, 1 it does not fully meet them<br />

due to the lack of certain critical information described above. In particular, the initial IRP does<br />

not provide the Board with adequate information required to make informed decisions about<br />

specific major future capital programs. Thus, the results of the IRP should be considered<br />

provisional, not final, and subject to modification as the additional information required is<br />

developed and the Recommended Plan is modified as appropriate. HW recognizes these<br />

limitations in the introductory section of the IRP in its call for an adaptive management<br />

approach.<br />

Based on the IRP results and Recommended Plan, HW prepared a short-term implementation<br />

plan covering the period 2013-2015. HW’s implementation plan for this three-year period<br />

identifies expenditure levels far greater than existing levels and more than double of those in the<br />

current Five-Year Capital Plan for this three-year period. At the same time HW indicates that<br />

any significant increase in expenditure levels above the spending identified in the Five-Year<br />

Capital Plan for this three-year period is likely unrealistic from the viewpoint of the increased<br />

revenue required as well as <strong>Halifax</strong> Water institutional capacity. Thus, in addition to the<br />

technical analyses required to fill in data gaps, there is also a need for an institutional capacity<br />

assessment.<br />

We acknowledge that the wastewater system in particular requires significant new investment for<br />

system repair, upgrade, and renewal. However, we take no position on the specific expenditure<br />

levels identified in the implementation plan for 2013-2015. The results of HW’s initial IRP have<br />

identified several key data gaps and uncertainties and HW has proposed several programs to<br />

address these.<br />

Recommendations Going Forward<br />

HW’s immediate priority should be to refine and detail an Action Plan, including milestones and<br />

a schedule, for conducting the programs it has proposed to fill the identified information gaps<br />

1 The purposes outlined in the UARB December 2010 decision were: to provide a framework for <strong>Halifax</strong> Water to<br />

evaluate alternative planning scenarios for its water, wastewater and stormwater services in an integrated fashion;<br />

to provide long-term direction for HW; to serve as an umbrella for which more detailed, facility- or programspecific<br />

capital investment analyses; to identify and plan for risks; and to provide the Board with the information<br />

and context it needs to make more fully informed decisions.<br />

October 31 2012 Page 271 of 272<br />