Series 360, Granville-Phillips, Stabil-Ion, Ionization, Vacuum ...
Series 360, Granville-Phillips, Stabil-Ion, Ionization, Vacuum ...
Series 360, Granville-Phillips, Stabil-Ion, Ionization, Vacuum ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter 2<br />
2 Initial Setup Procedures<br />
2.1 Control Unit Setup<br />
1. Open the front panel door and determine if any of the following options are installed:<br />
■ Process Control<br />
■ RS232 Computer Interface<br />
■ IEEE 488 Computer Interface<br />
RS-232<br />
ELECTROMETER<br />
CONVECTRON<br />
IG-1 AUTO<br />
PROCESS CONTROL<br />
Off SP On<br />
Data Port<br />
IG2 Scale<br />
IG1<br />
Factor<br />
Adjust<br />
Pressure<br />
Range<br />
L HL H<br />
Cathode<br />
1 21 2<br />
IG1 IG2<br />
OFF SET<br />
ATM<br />
VAC<br />
IG-2 AUTO<br />
OFF SET<br />
ATM<br />
VAC<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
3<br />
▲<br />
Set<br />
▲<br />
C<br />
H<br />
A<br />
N<br />
N<br />
E<br />
L<br />
IG1<br />
O<br />
Degas<br />
O<br />
IG2<br />
O<br />
On<br />
O<br />
Remote<br />
Figure 2-1<br />
Control Unit Front Panel (with Door Open) Showing Location of Computer<br />
Interface and Process Control Modules.<br />
2. If none of the above options are present and if the pressure display units of measure are correct<br />
(See Figure 2-2.), and you do not wish to change the degas power timer from the factory setting<br />
of 10 minutes, skip to Chapter 3 Installation.<br />
3. If one or more of the above options is<br />
present, or if you wish to change the<br />
units of measure or degas time setting,<br />
you may find it necessary to reconfigure<br />
certain switches within the<br />
Control Unit.<br />
IG 2.13 -8<br />
A<br />
B<br />
5.67 -2<br />
745<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
TORR<br />
IG1<br />
O<br />
IG2<br />
O<br />
DEGAS ON<br />
O O<br />
Figure 2-2<br />
Control Unit Front Panel Showing Location of Units of<br />
Measure Label.<br />
Review Sections 2.1.3, 2.1.4, 2.1.5, 2.1.6, and 2.1.7 for the factory default settings for the<br />
switches on these options, the pressure display units of measure, and the degas power timer to<br />
determine if any need changing. Now is a convenient time to make any required switch<br />
changes before mounting the Control Unit in its desired location.<br />
<strong>Series</strong> <strong>360</strong> <strong>Stabil</strong>-<strong>Ion</strong> December, 2001<br />
2-1