3 - Fort Stewart - U.S. Army
3 - Fort Stewart - U.S. Army
3 - Fort Stewart - U.S. Army
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Soldiers released from<br />
Active Duty<br />
‐ REFRAD/DEMOB within<br />
FORSCOM standard<br />
Standard: 100% FORSCOM Standard, timeline = 10‐14 days (not to include holdovers)<br />
Current Status: Green‐‐ 100%<br />
Total REFRAD: 73 Individual REFRAD Soldiers and 2,530 combined BCT DEMOB Soldiers for 1 st Quarter<br />
of FY 2011.<br />
Trend: FORSCOM standard was met for Released from Active<br />
Duty (REFRAD)/ Demobilization (DEMOB)<br />
1 st Quarter of FY 2011 timeframe.<br />
Analysis: In order to continually meet FORSCOM<br />
demobilization standards the Mobilization Branch will<br />
continue coordination of all required installationn directorates<br />
and the demobilizing brigades / units<br />
through monthly IPR’s, ROC Drills and VTC’s while emphasizing the importance of having required<br />
finance and personnel documentation at MOB Station 30 days prior to unit/BCT arrival<br />
based upon new<br />
guidance from First <strong>Army</strong> and IMCOM.<br />
Completed Action – 1. .3‐4.2%<br />
1.6‐3.1.6 ‐ Conduct monthly IPR’s and continue coordinationn for the 53 rd IBCT (FL) DEMOB<br />
1.6‐3.7 ‐ Maintain 31 Soldiers in the<br />
MOC by utilizing HRC tour announcements placed on AKO website<br />
in preparation for the 802 nd OD Co and 53 rd IBCT<br />
DEMOB<br />
1.6‐3.1.9 ‐ Change FORSCOM 5 day REFRAD model to 10‐14 days through coordination with IMCOMM and<br />
First <strong>Army</strong>.<br />
Historical Data:<br />
‣<br />
‣<br />
‣<br />
30 HBCT – NC<br />
(Jan 10 – Feb 10)<br />
48 IBCT – GA<br />
(Mar 10 – Apr 10)<br />
53 IBCT – FL<br />
(Nov 10 – Dec 10)<br />
Action Plan:<br />
Short Term < 3 months (JAN‐MAR)<br />
1.3‐4.2.1 ‐ Maintain Soldiers in the MOC by utilizing HRC tour announcements placed on AKO website in<br />
preparation for Unit DEMOB plus 52 REFRAD’s monthly<br />
Mid Term<br />
3‐6 months (APR‐JUN)<br />
1.3‐4.2.2 ‐Maintain Mob Planners (2) by initiating 2 nd year of contract option<br />
Long Term: > 6 months (JUL‐SEP)<br />
1.3‐4.2.3 ‐ Brief the importance of having finance and personnel required documentation at FSGA 30<br />
days priorr to first main<br />
body arrival in every scheduled IPR with demobilizing unit/BCT.