3 - Fort Stewart - U.S. Army
3 - Fort Stewart - U.S. Army
3 - Fort Stewart - U.S. Army
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FY 2011 ISR Services Documentation 10-Jan-12<br />
Service: 901. Mobilization and Deployment Support (Intellicode# 901-03-04) FY 2010 Intellicode #: 901-01-27<br />
Service Definition: Provide guidance and coordinate regional support for all aspects of Mobilization, Deployment, Redeployment, and Demobilization (MDRD) of Reserve Component (RC) units/individuals.<br />
Collect and analyze information concerning infrastructure development, SRM (sustainment, revitalization, and maintenance) and Base Operations Support (BOS) activities affecting the MDRD mission.<br />
Evaluate installation plans and operations, coordinating all regional staff actions relative to MDRD. Assess, evaluate, and coordinate support to soldiers at MDRD stations. Coordinate MDRD actions with<br />
installations, IMCOM, CONUSA, and MACOMs. Conduct staff assistance visits to garrisons regarding MDRD issues. Coordinate assistance for the enhancement of soldier readiness processing (SRP).<br />
Maintain situational awareness and prepare reports in support of mobilization and demobilization relative to Power Projection Platforms (PPPs) and Power Support Platforms (PSPs). Coordinate with<br />
installations, analyze input, and prepare and submit a daily SITREP to all required customers.<br />
Measure Description: Installation Mobilization Plan updated triennially and submitted to First <strong>Army</strong> through the IMCOM Region office for approval.<br />
Major Service Area Service Function Primary Service Category 3 (Weight 17%)<br />
Mission Support Plans and Operations Mobilization & Demobilization Planning<br />
Measure Type Frequency Formula<br />
Services Annual [a]<br />
Active ARNG RSC USAR INST <strong>Army</strong>-Wide NA Measure Toploaded Info Only<br />
Y Y Y<br />
Green Standard Amber Standard Red Standard Black Standard<br />
36 months or less More than 36 months<br />
Data Element Description<br />
YTD<br />
Method<br />
Element<br />
Toploaded<br />
Q1 Q2 Q3 Q4<br />
Annual<br />
a = As of 30 Sep of the last FY, how many months had it been since the Installation Mobilization Plan was updated? Annual N/A N/A N/A N/A<br />
b =<br />
c =<br />
d =<br />
e =<br />
f =<br />
g =<br />
h =<br />
i =<br />
Data Source/Notes: DPTMS records.<br />
First <strong>Army</strong> has waived this requirement until Guidance from 1A MPAT<br />
FY 2011 ISR Services – All documentation can be downloaded from http://isr.hqda.pentagon.mil<br />
Evaluator Signature:______________________________________________________________________________________________________________________Date__________________________________________________