Average processing time required to complete Soldier Readiness Processs (SRP)<br />
Standard: (FORSCOM Standard) > = 90% (MOB date + 25 Days) IAW 25 Day Rule<br />
Current Status: Green<br />
90<br />
Trend: Manpower and<br />
equipment assessed based on mission size; processing time has<br />
been met to<br />
standard for every mobilization mission.<br />
Analysis: No IBCT mobilizations for<br />
the quarter. HQDA personnel packet decision authority is of the<br />
opinion that they cannot support IMCOM request for MOB/DEMOB support at FSGA.<br />
Total 231 personnel are required for SRP to process 200 Soldiers (MAX) per day for average BCT of 3400<br />
based upon an 8‐10 hour day:<br />
MOB Branch: 2‐D/2C = 4 MOC: 31‐S<br />
RSO: 4 – S<br />
Security Division: 4 – D ACS: 2 – D<br />
DHR (Personnel): 16D/ /8‐ C = 24 Finance: 16‐S/ 1‐D/ 10‐C = 27<br />
DENTAC: 25‐S/ 17‐D/ 8‐ C = 50<br />
Legal: 2‐D/ 2‐S = 4<br />
MEDDAC: 2‐S/ 51‐ D = 53<br />
VA: 4‐D<br />
DOL: 12‐D/12‐C =24<br />
Legend: S= Soldier, D= DA Civilian, C= Contractor<br />
Completed Actions: Completed 11 Soldiers of CBS for Qtr.<br />
Action Plan:<br />
Short Term: < 3 months (JAN‐MAR)<br />
1.3‐5.2.1 ‐ Maintain 31<br />
Soldiers in the MOC by utilizing HRC tour announcements placed on AKO website<br />
1.3‐5.2.2 ‐ Conduct Action Officer training for new MOB Team<br />
personnel<br />
Mid Term: 3‐6 months<br />
(APR‐JUN)<br />
1.3‐5.2.3 ‐ Conduct refresher training for MOC Soldiers and <strong>Army</strong> Civilians<br />
on the DAMPS‐U system<br />
1.3‐5.2.4 ‐ Maintain MOB Branch Contractors (2 MOB Planners) by exercising contract option prior to<br />
the first year of contract expiration (31 May 2011)<br />
Long Term: > 6 months (JUL‐SEP)<br />
1.3‐5.2.5 ‐ Conduct DARTS refresher training for MOB Team and Installation agencies