12.02.2014 Views

3 - Fort Stewart - U.S. Army

3 - Fort Stewart - U.S. Army

3 - Fort Stewart - U.S. Army

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NETC-SFG-DY 29 September 2011<br />

MEMORANDUM FROM Network Enterprise Center, Installation COMSE C Control Center<br />

MEMORANDUM FOR RECORD<br />

SUBJECT: Report of COMSEC Inspection for Local Element 5E3310-64 (MOB)<br />

1. On 29 September 2011, a COMSEC inspection of Local Element 5E3310-64 was conducted. Ms.<br />

Monica Perez, the primary hand receipt holder, was present during theinspectim.<br />

2. No discrepancies were noted at your facility. Your facility was rated as Satisfactory. The inspection<br />

report will be filed and carried forward in your active account records for review during the next<br />

inspection.<br />

GS-05<br />

NEC COMSEC INPECTOR

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!