On-Board® W Module Programming and Operation ... - PTB Sales
On-Board® W Module Programming and Operation ... - PTB Sales
On-Board® W Module Programming and Operation ... - PTB Sales
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>On</strong>-Board W <strong>Module</strong> <strong>Programming</strong> <strong>and</strong> <strong>Operation</strong><br />
CTI-CRYOGENICS<br />
HELIX TECHNOLOGY CORPORATION<br />
From page 3-22<br />
ROUGH 125µ/50µ<br />
Displays the current pressure (125µ) <strong>and</strong> the base pressure to be<br />
achieved (50µ). The waterpump is roughed out until the base<br />
pressure is reached.<br />
REPURGE #1 2M<br />
If the pressure does not reduce at a reasonable rate during the rough<br />
out phase, the <strong>On</strong>-Board W <strong>Module</strong> will automatically repurge the<br />
waterpump for the programmed REPURGE time. The display<br />
indicates that this is the first purge cycle (#1) <strong>and</strong> that there are two<br />
minutes (2M) remaining in this cycle.<br />
The waterpump is roughed out again until the base pressure is reached.<br />
The following events occur:<br />
- Waterpump TC reaches programmed base pressure of 50µ<br />
- Rough valve closes <strong>and</strong> the <strong>On</strong>-Board W <strong>Module</strong> waits 15 seconds<br />
to stabilize<br />
- <strong>On</strong>-Board W <strong>Module</strong> measures TC pressure <strong>and</strong> takes second reading<br />
in 30 seconds<br />
- <strong>On</strong>-Board W <strong>Module</strong> calculates ROR pressure increase in µ/minute<br />
- If ROR is less than programmed value, the ROR test passes<br />
- If ROR is more than programmed value, the ROR test is repeated<br />
ROR 3 124µ/10µ<br />
The display indicates the number of ROR test cycles (3), current ROR<br />
value (124µ/µ), <strong>and</strong> the programmed ROR value (10µ/µ).<br />
If ROR test is repeated:<br />
- Rough valve opens<br />
- Waterpump is roughed out again to base pressure<br />
- ROR test is repeated<br />
Continued on page 3-24<br />
Figure 3-23: <strong>On</strong>-Board Appendage Waterpump<br />
REGEN Cycle Program Example (continued)<br />
P/N 8040365 3-23