On-Board® W Module Programming and Operation ... - PTB Sales
On-Board® W Module Programming and Operation ... - PTB Sales
On-Board® W Module Programming and Operation ... - PTB Sales
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>On</strong>-Board W <strong>Module</strong> <strong>Programming</strong> <strong>and</strong> <strong>Operation</strong><br />
CTI-CRYOGENICS<br />
HELIX TECHNOLOGY CORPORATION<br />
Table C-1: RS-232 REGEN Responses <strong>and</strong> Descriptions (Continued)<br />
REGEN Response<br />
Description<br />
I,J,K, T<br />
ROUGH TO BASE<br />
Purging is completed <strong>and</strong> the pump is being roughed to a base pressure.<br />
This is displayed showing the actual pressure, <strong>and</strong> the base<br />
pressure it is attempting to reach. The comm<strong>and</strong>s for this<br />
information are<br />
L actual pressure<br />
P3? Pressure attempting to reach (programmed value)<br />
Example:<br />
ROUGH 325u/100u = ROUGH actual pressure/try to reach pressure<br />
ROUGH L u/P3?u<br />
NOTE: If this is a multi-pump system, the pump roughing valve may<br />
be waiting to use the valve.<br />
The valve use is controlled by a token pass. Use the following comm<strong>and</strong><br />
to access this information,<br />
Comm<strong>and</strong> Q? A response of 1 means the pump has the token.<br />
A response of 2 means the pump needs the token.<br />
L<br />
ROR (Rate-of-Rise): In this display we show how many rate-of-rises<br />
have been done the actual rate-of-rise <strong>and</strong> the rate-of-rise it is<br />
attempting to reach (the programmed value).<br />
The comm<strong>and</strong>s for this information are:<br />
m ROR#<br />
n Last ROR value (actual rate-of-rise for most recent test)<br />
P4? Programmed value for ROR<br />
Example of Display:<br />
ROR #1, 34/10 u/MIN<br />
ROR #m, n/p4? u/MIN<br />
P/N 8040365 C-3