07.07.2014 Views

1956 AMC Hudson Technical Service Manual Supplement

1956 AMC Hudson Technical Service Manual Supplement

1956 AMC Hudson Technical Service Manual Supplement

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HYDRA-MATIC TRANSMISSION 85<br />

Install torus feed valve into large bore on side of pump<br />

opposite priming springs with long land entering first (Fig.<br />

102).<br />

FIGURE 104—Installing Vanes in Rotor<br />

FIGURE 102—Installing Torus Feed Valve<br />

Assembly<br />

After torus feed valve assembly is installed, make sure<br />

that free movement of the valve can be obtained by moving<br />

the slide.<br />

Install oil cooler ball into oil cooler passage which is<br />

nearest to dowel. Then install the spring and spring retainer<br />

pin (Fig. 103).<br />

Check with feeler gauge between each vane and inside<br />

diameter of slide to make certain that clearance does not<br />

exceed .003".<br />

NOTE: With vanes contacting slide on one side,<br />

clearance should not exceed .003" on opposite<br />

side. If clearance is excessive, pump must be<br />

replaced.<br />

Install front cover to pump body with four attaching<br />

screws using short screw in hole nearest top of pump,<br />

opposite intake pipe hole.<br />

Turn pump over and make sure oil rings are in place on<br />

overrun clutch piston and hub in front pump body. Put<br />

location marks on front body and overrun clutch piston<br />

opposite dowel so piston can be aligned with dowels.<br />

Align piston with dowels and install overrun clutch<br />

piston into front pump cavity compressing piston ring with<br />

fingers (Fig. 105).<br />

FIGURE 103—Installing Cooler Check Valve<br />

Assembly<br />

Install bottom vane ring into front pump cavity locating<br />

it in the center of the slide. Then install the rotor with drive<br />

slots up. Install the seven vanes with proper side against<br />

vane rings. The vanes will have polished areas where they<br />

contact the vane rings. Install top vane ring on rotor and<br />

check to see that rotor rotates freely (Fig. 104).<br />

The total clearance between vanes and slide, with the<br />

vane rings installed, should be .000"-.003".<br />

FIGURE 105—Installing Overrun Clutch Piston<br />

in Front Pump

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!