FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia
FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia
FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Gunung Stong State Park Preliminary Management Plan<br />
of salaries (and overtimes, and claims), utilities, rentals, maintenance, and fuel expenses.<br />
Table 6.5 below contains the estimated capital and development budget for GSSP for the first<br />
three years of operations. The figures provided are only indicative but should help the park<br />
management in drawing up their development and operating budgets.<br />
Table 6.5: Estimated Capital and Development Budget for GSSP (Years 1-3)<br />
No. Item Description RM<br />
1 Office equipment Furniture, desktops, cabinets, stationery, for GSSP<br />
office.<br />
2. Two 4WD vehicles For use in logistics, boundary patrol and transport to<br />
HQ.<br />
3. Directional signposts To be placed at trail junctions, and river crossings, to<br />
avoid getting lost. 50 units @ RM1,000 each (includes<br />
cost of porters and labour for erecting them).<br />
4. Destination<br />
signposts<br />
To be placed at every 500m intervals, along trails,<br />
indicating distance to next campsite or summit. 100<br />
units @ RM1,500 each (includes porterage and labour).<br />
5. Summit signposts To be placed on seven summits: G. Ayam, G. Stong, G.<br />
Tera, G. Che Tahir, G. Birut, G. Menyelit, and montane<br />
wetland. 7 units @ RM2,000 each (include porterage<br />
and labour for installation).<br />
6. Warning signposts To be placed at Stong Resort, Baha Camp, entrance to<br />
Semuliang Trail, Lata Kertas, campsites, and selected<br />
boundary areas. 20 units @ RM1,000 each (inclusive of<br />
porterage and labour for installation)<br />
7. Huts at Baha Camp The 10 existing huts at Baha Camp should be improved<br />
with better material, and basic huts should be<br />
constructed at campsites and summits for shelter. 30<br />
units (12 at Baha Camp, 7 at summits, and 11 at<br />
campsites, at RM10,000 each (include porterage and<br />
labour).<br />
20,000<br />
180,000<br />
50,000<br />
150,000<br />
14,000<br />
20,000<br />
300,000<br />
TOTAL 684,000<br />
The estimated annual operating costs for GSSP are presented in Table 6.6.<br />
Table 6.6: Estimated Annual Operating Costs for GSSP<br />
No. Item Description RM<br />
1. Salary and emolument for Park<br />
Officer (G44)<br />
2. Salary and emoluments for 2 Asst.<br />
Park Officers (G27).<br />
3. Salary and emoluments for 2 Park<br />
Rangers (G17).<br />
4. Salary and emoluments for 6 Asst.<br />
Park Rangers (G11).<br />
5. Salary and emoluments for 2<br />
drivers (R3)<br />
6. Fuel and motor vehicle<br />
maintenance for 2 4WD.<br />
At RM4,000 per month. 48,000<br />
At RM2,500 each per month. 60,000<br />
At RM2,000 each per month. 48,000<br />
At RM1,500 each per month. 72,000<br />
At RM1,000 each per month. 24,000<br />
At RM1,000 per month each<br />
for 12 months<br />
24,000<br />
76