06.08.2014 Views

FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia

FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia

FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Gunung Stong State Park Preliminary Management Plan<br />

of salaries (and overtimes, and claims), utilities, rentals, maintenance, and fuel expenses.<br />

Table 6.5 below contains the estimated capital and development budget for GSSP for the first<br />

three years of operations. The figures provided are only indicative but should help the park<br />

management in drawing up their development and operating budgets.<br />

Table 6.5: Estimated Capital and Development Budget for GSSP (Years 1-3)<br />

No. Item Description RM<br />

1 Office equipment Furniture, desktops, cabinets, stationery, for GSSP<br />

office.<br />

2. Two 4WD vehicles For use in logistics, boundary patrol and transport to<br />

HQ.<br />

3. Directional signposts To be placed at trail junctions, and river crossings, to<br />

avoid getting lost. 50 units @ RM1,000 each (includes<br />

cost of porters and labour for erecting them).<br />

4. Destination<br />

signposts<br />

To be placed at every 500m intervals, along trails,<br />

indicating distance to next campsite or summit. 100<br />

units @ RM1,500 each (includes porterage and labour).<br />

5. Summit signposts To be placed on seven summits: G. Ayam, G. Stong, G.<br />

Tera, G. Che Tahir, G. Birut, G. Menyelit, and montane<br />

wetland. 7 units @ RM2,000 each (include porterage<br />

and labour for installation).<br />

6. Warning signposts To be placed at Stong Resort, Baha Camp, entrance to<br />

Semuliang Trail, Lata Kertas, campsites, and selected<br />

boundary areas. 20 units @ RM1,000 each (inclusive of<br />

porterage and labour for installation)<br />

7. Huts at Baha Camp The 10 existing huts at Baha Camp should be improved<br />

with better material, and basic huts should be<br />

constructed at campsites and summits for shelter. 30<br />

units (12 at Baha Camp, 7 at summits, and 11 at<br />

campsites, at RM10,000 each (include porterage and<br />

labour).<br />

20,000<br />

180,000<br />

50,000<br />

150,000<br />

14,000<br />

20,000<br />

300,000<br />

TOTAL 684,000<br />

The estimated annual operating costs for GSSP are presented in Table 6.6.<br />

Table 6.6: Estimated Annual Operating Costs for GSSP<br />

No. Item Description RM<br />

1. Salary and emolument for Park<br />

Officer (G44)<br />

2. Salary and emoluments for 2 Asst.<br />

Park Officers (G27).<br />

3. Salary and emoluments for 2 Park<br />

Rangers (G17).<br />

4. Salary and emoluments for 6 Asst.<br />

Park Rangers (G11).<br />

5. Salary and emoluments for 2<br />

drivers (R3)<br />

6. Fuel and motor vehicle<br />

maintenance for 2 4WD.<br />

At RM4,000 per month. 48,000<br />

At RM2,500 each per month. 60,000<br />

At RM2,000 each per month. 48,000<br />

At RM1,500 each per month. 72,000<br />

At RM1,000 each per month. 24,000<br />

At RM1,000 per month each<br />

for 12 months<br />

24,000<br />

76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!