Under the Kingsbridge MUD and North Mission Glen MUD scenarios, the wastewater<br />

from the <strong>Four</strong> <strong>Corner</strong>s area will be collected into a single pump station to be located<br />

adjacent to Old Richmond Road south of Boss-Gaston Road. From this pump station,<br />

wastewater will be pumped via force main to an existing 12-inch gravity sanitary sewer<br />

located at the intersection of Bissonnet Road and Richmond-Gaines Road (Kingsbridge<br />

MUD scenario) or to the North Mission Glen MUD wastewater treatment plant located<br />

on Keegans Bayou, north of the <strong>Four</strong> <strong>Corner</strong>s area (North Mission Glen scenario).<br />

For the On-site scenario, a wastewater treatment plant site is tentatively located along<br />

Old Richmond Road near the southern limits of the planning area and discharges to Red<br />

Gully. No specific tract of land has been identified at this time for the treatment plant<br />

site. However, the southern portion of the planning area provides the most accessible<br />

possibilities for outfall into Red Gully.<br />

<strong>Water</strong> distribution system layouts for the on-site and Kingsbridge scenanos are very<br />

similar with the use of 12-inch water mains along Richmond-Gaines and Boss-Gaston<br />

Roads. Six-inch and eight-inch water lines are used throughout the rest of the system.<br />

Under the Kingsbridge scenario, the <strong>Four</strong> <strong>Corner</strong>s distribution system will connect to the<br />

Kingsbridge water supply through an existing 12-inch water line located on Boss-Gaston<br />

Road east of Richmond-Gaines Road and to an existing 12-water line located at the<br />

intersection of Bissonnet and Richmond-Gaines. This layout will provide the <strong>Four</strong><br />

<strong>Corner</strong>s area with two points of connection to the Kings bridge water supply system.<br />

The on-site water scenario shows the construction of a water supply plant near Old<br />

Richmond Road south of Boss-Gaston Road. As with the on-site wastewater system<br />

scenario, no specific tract of land has been identified for the water plant location.<br />

However, the location shown on the layout in Appendix C is centrally located to the<br />

entire planning area.<br />

B. Design Criteria - Public water distribution and supply systems must be designed in<br />

accordance with <strong>Texas</strong> Natural<br />

Resource Conservation Commission (TNRCC)<br />

Preliminary Engineering Report<br />

Page 19 of28