11.10.2014 Views

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

V. Proposed Project<br />

A. Recommended Alternative - With the exception of the points of source connection<br />

for water supply and wastewater treatment, there is very little difference in the overall<br />

water and sewer system layouts for the three scenarios evaluated (On-site, Kingsbridge<br />

MUD and North Mission Glen MUD). Due to the size of the planning area, pump<br />

stations and lift stations are necessary for an efficient wastewater collection system for<br />

each of the scenarios evaluated.<br />

The recommended source of water supply and wastewater treatment as the Kingsbridge<br />

MUD option. As shown in the water distribution system layouts and wastewater<br />

collection system layouts in Appendix A, the <strong>Four</strong> Comers Planning Area was broken<br />

down into three geographic service areas. These areas account for the majority of the<br />

existing 350 connections. The detailed cost estimates provided in Appendix A for this<br />

scenario include a breakdown of water distribution and wastewater collection system<br />

costs by each individual area. The following table provides a summary of the water<br />

distribution and wastewater collection system costs for the Kings bridge MUD option.<br />

Page 24 of28<br />

Preliminary Engineerng Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!