11.10.2014 Views

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

If water supply and wastewater treatment capacity is secured by the <strong>Four</strong> <strong>Corner</strong>s area<br />

from an adjacent utility district, no permits from the TNRCC or the Fort Bend<br />

Subsidence District will be necessary. The existing water supply and wastewater<br />

treatment systems will be covered under permits issued to the district owning and<br />

operating the facilities. However, construction drawings for any water<br />

distribution/supply and wastewater collection/treatment proposed to serve the <strong>Four</strong><br />

<strong>Corner</strong>s area must be approved by the City of Houston and the TNRCC.<br />

6.5 RIGHT-OF-WAY REQUIREMENTS<br />

The proposed trunk water and sanitary sewer facilities to serve the <strong>Four</strong> <strong>Corner</strong>s area will<br />

be constructed along the major roadways of Boss-Gaston/Old Richmond Road and<br />

Richmond-Gaines Road. Right-of-way widths along these roadways vary in width from<br />

50 to 70 feet. No additional right-of-way acquisition would be anticipated. However,<br />

field visits have found evidence of gas, electric and telephone utilities along both<br />

roadways. Exact locations of these facilities will be necessary in final design and may<br />

dictate the location of the proposed water and sewer facilities relative to the existing<br />

roadway/drainage and utilities. To provide for a looped connection of the water system<br />

east of Richmond-Gaines Road, acquisition of a water line easement along the east side<br />

of the Atanacia Martinez subdivision from Old Richmond Road south to Dora Lane will<br />

be required.<br />

Lift station and pump station sites have been preliminarily located along Boss-Gaston<br />

Road and Richmond-Gaines Road as shown on the sanitary sewer system layout in the<br />

Appendices. These locations include some flexibility in terms of their physical location<br />

on each roadway but acquisition of each site will be necessary as each proposed station is<br />

included in the final design.<br />

The streets within the Atanacia Martinez subdivision include a combination of dedicated<br />

street rights-of-way and easements for access to existing housing units in the subdivision.<br />

Many of the east-west streets in the subdivision between Second Street and Richmond-<br />

<strong>Four</strong> <strong>Corner</strong>s Area <strong>Water</strong> and Wastewater Facilities Planning Study<br />

Page 6-6<br />

FINAL REPORT<br />

Revised 2/10/99

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!