11.10.2014 Views

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE 10.2.1<br />

WATER SUPPLY AND<br />

WASTEWATER TREATMENT COSTS<br />

Wastewater Treatment (Capital Recovery Costs)<br />

350 Single Family Connections<br />

Contingencies (I 0%)<br />

TOTAL WASTEWATER<br />

North Mission<br />

Glen MUD<br />

$ 385,000<br />

38 500<br />

$ 423,500<br />

Kings bridge<br />

MUD<br />

$ I85,000<br />

I8 500<br />

$203,500<br />

<strong>Water</strong> Supply (Capital Recovery Costs)<br />

350 Single Family Connections<br />

Contingencies (10%)<br />

TOTAL WATER<br />

Residential Monthly <strong>Water</strong> Rates<br />

(Up to 8,000 gallons)<br />

Residential Monthly Sewer Rates<br />

Wastewater Cost (per connection)<br />

<strong>Water</strong> Cost (per connection)<br />

N/A<br />

N/A<br />

$ 20.00<br />

$ I,2IO<br />

N/A<br />

$359,300<br />

35 930<br />

$395,230<br />

$ I5.50<br />

$ 22.00<br />

$ 58 I<br />

$ I, I29<br />

<strong>Four</strong> Comers Area <strong>Water</strong> and Wastewater Facilities Planning Study<br />

Page 10-4<br />

FINAL REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!