7.0 OPERATIONAL COSTS<br />

With the acquisition of surplus water supply and wastewater treatment capacity from<br />

Kingsbridge MUD, no operation and maintenance costs for the water supply plant and<br />

wastewater treatment plant will be born directly by the <strong>Four</strong> Comers area. The annual<br />

costs for the operation of the plant facilities is incorporated into the rate structure for<br />

water and sewer service provided by Kingsbridge MUD.<br />

The costs for operation and maintenance of the wastewater collection system, lift/pump<br />

stations and the water distribution system will be the responsibility of the <strong>Four</strong> Comers<br />

area. These costs can be assessed by the <strong>Four</strong> Comers Waster Supply Corporation or<br />

similar entity on the customers within the planning area on a monthly basis by<br />

incorporating the costs into the ultimate rate charges to the customers. These ultimate<br />

rate charges would include the actual cost of service from Kings bridge MUD in addition<br />

to a surcharge to cover operation, maintenance and administrative costs. Most utility<br />

districts contract with an operations company to maintain their water and sewer facilities<br />

using state licensed operating personnel.<br />

Costs for operation and maintenance of wastewater collection systems and the water<br />

distribution systems vary between different municipalities and utility districts within the<br />

southeast <strong>Texas</strong> area. Larger, more complex systems require more intensive operator<br />

involvement in day to day operations. However, the major maintenance/operational issue<br />

for proposed water and wastewater systems for the <strong>Four</strong> <strong>Corner</strong>s area will be the<br />

lift/pumping stations. Because the facilities involve mechanical and electrical equipment,<br />

the potential for breakdown exists. Based upon reviews of operation and administration<br />

costs for similar types of water distribution and wastewater collection systems in the area,<br />

an annual budget amount of$50,000 to $100,000 could be expected for the <strong>Four</strong> <strong>Corner</strong>s<br />

area.<br />

<strong>Four</strong> Comers Area <strong>Water</strong> and Wastewater Facilities Planning Study<br />

FINAL REPORT Page 7-1