and/or sewer capacity was currently available or would be available in the near term (see<br />

Section 10 for summary of all district contacts).<br />

Appendices A, B, and C provide water distribution and wastewater collection system<br />

layouts for the alternatives considered from Kingsbridge MUD, North Mission Glen<br />

MUD, and On-site, respectively. <strong>Water</strong> distribution layouts are shown only for the Onsite<br />

option and connection to Kingsbridge MUD. North Mission Glen is currently<br />

evaluating their water supply system and will not be able to assess their surplus water<br />

capacity until completion of their study. Wastewater collection systems are shown for all<br />

three options.<br />

The wastewater collection schemes for the On-site, Kings bridge MUD and North Mission<br />

Glen MUD options are very similar with 12-inch gravity trunk sewer lines being located<br />

on Richmond-Gaines Road and Boss-Gaston Road and 8-inch gravity sewer lines being<br />

used throughout the residential areas. Three lift/pump stations are required to provide<br />

service to the total planning area because of the size of the planning area, the limitations<br />

on the depths of gravity sanitary sewer construction and the potential for construction in<br />

wet sand conditions. Under the On-site scenario, one of the three stations would be<br />

constructed at the site of the wastewater treatment plant facility.<br />

Under the Kingsbridge MUD and North Mission Glen MUD scenarios, the wastewater<br />

from the <strong>Four</strong> Comers area will be collected into a single pump station to be located<br />

adjacent to Old Richmond Road south of Boss-Gaston Road. From this pump station,<br />

wastewater will be pumped via force main to an existing 12-inch gravity sanitary sewer<br />

located at the intersection of Bissonnet Road and Richmond-Gaines Road (Kingsbridge<br />

MUD scenario) or to the North Mission Glen MUD wastewater treatment plant located<br />

on Keegans Bayou, north of the <strong>Four</strong> <strong>Corner</strong>s area (North Mission Glen scenario).<br />

For the On-site scenario, a wastewater treatment plant site is tentatively located along Old<br />

Richmond Road near the southern limits of the planning area and discharges to Red<br />

Gully. No specific tract of land has been identified at this time for the treatment plant site.<br />

<strong>Four</strong> <strong>Corner</strong>s Area <strong>Water</strong> and Wastewater Facilities Planning Study<br />

Page 5-6<br />

FINAL REPORT<br />

Revised 2/l 0/99