11.10.2014 Views

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FOUR CORNERS AREA<br />

WATER & WASTEWATER FACILITIES PLANNING STUDY<br />

I I I I I I I I<br />

PRELIMINARY COST ESTIMATE<br />

<strong>Water</strong> Distribution System from Kings bridge MUD<br />

I<br />

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL<br />

I<br />

Area 1 (Richmond-Gaines/Boss Gaston Road Area)<br />

6-inch <strong>Water</strong> Line L.F. 4250 $15.00 $63,750<br />

8-inch <strong>Water</strong> Line L.F. 25680 $18.00 $462,240<br />

12-inch <strong>Water</strong> Line L.F. 8530 $25.00 $213,250<br />

Fire Hydrant EA. 73 $2,000.00 $146,000<br />

2-inch Blow-off Valve EA. 7 $500.00 $3,500<br />

6-inch Gate Valve EA. 9 $550.00 $4,950<br />

8-inch Gate Valve EA. 48 $750.00 $36,000<br />

12-inch Gate Valve EA. 14 $1,200.00 $16,800<br />

Connection to Existing <strong>Water</strong> Line EA. 2 $1,000.00 $2,000<br />

Appurtenances (wet sand, steel sections, etc.) L.S. 1 $263,390.00 $263,390<br />

Trench Safety System for <strong>Water</strong> Line L.F. 38460 $1.00 $38,460<br />

Service Tap w/ Connection to Existing Residence EA. 275 $1,200.00 $330,000<br />

Area 1 Subtotal $1,580,340<br />

Area 2 (Boss Gaston Road west of Landfill)<br />

6-inch <strong>Water</strong> Line L.F. 600 $15.00 $9,000<br />

8-inch <strong>Water</strong> Line L.F. 9360 $18.00 $168,480<br />

Fire Hydrant EA. 20 $2,000.00 $40,000<br />

2-inch Blow-off Valve EA. 1 $500.00 $500<br />

8-inch Gate Valve EA. 14 $750.00 $10,500<br />

Appurtenances (wet sand, steel sections, etc.) L.S. 1 $53,688.00 $53,690<br />

Trench Safety System for <strong>Water</strong> Line L.F. 9960 $1.00 $9,960<br />

Service Tap w/ Connection to Existing Residence EA. 25 $1,200.00 $30,000<br />

Area 2 Subtotal $322,130<br />

Area 3 (Richmond Road south of Dora Lane)<br />

6-inch <strong>Water</strong> Line L.F. 1620 $15.00 $24,300<br />

8-inch <strong>Water</strong> Line L.F. 5180 $18.00 $93,240<br />

Fire Hydrant EA. 16 $2,000.00 $32,000<br />

2-inch Blow-offValve EA. 2 $500.00 $1,000<br />

6-inch Gate Valve EA. 2 $550.00 $1 '1 00<br />

8-inch Gate Valve EA. 8 $750.00 $6,000<br />

Appurtenances (wet sand, steel sections, etc.) L.S. 1 $44,888.00 $44,890<br />

Trench Safety System for <strong>Water</strong> Line L.F. 6800 $1.00 $6,800<br />

Service Tap w/ Connection to Existing Residence EA. 50 $1,200.00 $60,000<br />

Area 3 Subtotal $269,330<br />

t<br />

SUBTOTAL CONSTRUCTION , $2,171,800<br />

CONTINGENCIES (15%) ' 1<br />

$325,770<br />

I<br />

Revised 2/10/99

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!