permanent rules, Chapter 290 (<strong>Water</strong> Hygiene). Sanitary sewer collection and treatment<br />

systems must be designed in accordance with TNRCC permanent rules, Chapter 317<br />

(Design Criteria for Sewage Systems). The <strong>Four</strong> <strong>Corner</strong>s planning area lies within the<br />

Extra-Territorial Jurisdiction of the City of Houston. In addition to the requirements of<br />

TNRCC, water and sanitary sewer facilities must be designed in accordance with the<br />

September 1996 "Design Manual for Wastewater Collection Systems, <strong>Water</strong> Lines,<br />

Storm Drainage and Street Paving" issued by the City of Houston Department of Public<br />

Works and Engineering. City of Houston design requirements are more stringent than<br />

TNRCC with respect to certain design elements of water and wastewater systems.<br />

Construction drawings for water and sanitary sewer facilities must be approved and<br />

signed by the City of Houston prior to the initiation of construction.<br />

C. Right-Of-Way Requirements - The proposed trunk water and sanitary sewer<br />

facilities to serve the <strong>Four</strong> <strong>Corner</strong>s area will be constructed along the major roadways of<br />

Boss-Gaston/Old Richmond Road and Richmond-Gaines Road. Right-of-way widths<br />

along these roadways vary in width from 50 to 70 feet. No additional right-of-way<br />

acquisition would be anticipated. However, field visits have found evidence of gas,<br />

electric and telephone utilities along both roadways. Exact locations of these facilities<br />

will be necessary in final design and may dictate the location of the proposed water and<br />

sewer facilities relative to the existing roadway/drainage and utilities. To provide for a<br />

looped connection of the water system east of Richmond-Gaines Road, acquisition of a<br />

water line easement along the east side of the Atanacia Martinez subdivision from Old<br />

Richmond Road south to Dora Lane will be required.<br />

Lift station and pump station sites have been preliminarily located along Boss-Gaston<br />

Road and Richmond-Gaines Road as shown on the sanitary sewer system layout in the<br />

Appendices. These locations include some flexibility in terms of their physical location<br />

on each roadway but acquisition of each site will be necessary as each proposed station<br />

is included in the final design.<br />

Page 20 of28<br />

Preliminary Engineerng Report