11.10.2014 Views

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

V. Proposed Project<br />

A. Recommended Alternative - With the exception of the points of source connection<br />

for water supply and wastewater treatment, there is very little difference in the overall<br />

water and sewer system layouts for the three scenarios evaluated (On-site, Kingsbridge<br />

MUD and North Mission Glen MUD). Due to the size of the planning area, pump<br />

stations and lift stations are necessary for an efficient wastewater collection system for<br />

each of the scenarios evaluated.<br />

The recommended source of water supply and wastewater treatment as the Kingsbridge<br />

MUD option. As shown in the water distribution system layouts and wastewater<br />

collection system layouts in Appendix A, the <strong>Four</strong> Comers Planning Area was broken<br />

down into three geographic service areas. These areas account for the majority of the<br />

existing 350 connections. The detailed cost estimates provided in Appendix A for this<br />

scenario include a breakdown of water distribution and wastewater collection system<br />

costs by each individual area. The following table provides a summary of the water<br />

distribution and wastewater collection system costs for the Kings bridge MUD option.<br />

Page 24 of28<br />

Preliminary Engineerng Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!