11.10.2014 Views

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

Four Corner - Texas Water Development Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FOUR CORNERS AREA<br />

WATER & WASTEWATER FACILITIES PLANNING STUDY<br />

I I I I I I I I<br />

PRELIMINARY COST ESTIMATE<br />

<strong>Water</strong> Distribution System from On-Site <strong>Water</strong> Plant<br />

I<br />

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL<br />

I<br />

Area 1 (Richmond-Gaines/Boss Gaston Road Area)<br />

6-inch <strong>Water</strong> Line L.F. 4250 $15.00 $63,750<br />

8-inch <strong>Water</strong> Line L.F. 27140 $18.00 $488,520<br />

12-inch <strong>Water</strong> Line L.F. 5420 $25.00 $135,500<br />

Fire Hydrant EA. 70 $2,000.00 $140,000<br />

2-inch Blow-off Valve EA. 7 $500.00 $3,500<br />

6-inch Gate Valve EA. 9 $550.00 $4,950<br />

8-inch Gate Valve EA. 51 $750.00 $38,250<br />

12-inch Gate Valve EA. 9 $1,200.00 $10,800<br />

Appurtenances (wet sand, steel sections, etc.) L.S. 1 $250,420.00 $250,420<br />

Trench Safety System for <strong>Water</strong> Line L.F. 36810 $1.00 $36,810<br />

Service Tap w/ Connection to Existing Residence EA. 275 $1,200.00 $330,000<br />

Area 1 Subtotal $1,502,500<br />

Area 2 (Boss Gaston Road west of Landfill)<br />

I<br />

6-inch <strong>Water</strong> Line L.F. I 600 $15.00 $9,000<br />

8-inch <strong>Water</strong> Line L.F. 9360 $18.00 $168,480<br />

Fire Hydrant EA. 20 $2,000.00 $40,000<br />

2-inch Blow-off Valve EA. 1 $500.00 $500<br />

8-inch Gate Valve EA. 14 $750.00 $10,500<br />

Appurtenances (wet sand, steel sections, etc.) L.S. 1 $53,690.00 $53,690<br />

Trench Safety System for <strong>Water</strong> Line L.F. 9960 $1.00 $9,960<br />

Service Tap w/ Connection to Existing Residence EA. 25 $1,200.00 $30,000<br />

Area 2 Subtotal $322,130<br />

Area 3 (Richmond Road south of Dora Lane)<br />

6-inch <strong>Water</strong> Line L.F. 1620 $15.00 $24,300<br />

8-inch <strong>Water</strong> Line L.F. 5180 $18.00 $93,240<br />

Fire Hydrant EA. 16 $2,000.00 $32,000<br />

2-inch Blow-off Valve EA. 2 $500.00 $1,000<br />

6-inch Gate Valve EA. 2 $550.00 $1 '1 00<br />

8-inch Gate Valve EA. 8 $750.00 $6,000<br />

I<br />

Appurtenances (wet sand, steel sections, etc.)<br />

L.S.<br />

I<br />

1 ! $44,890.00 $44,890<br />

Trench Safety System for <strong>Water</strong> Line L.F. I 6800! $1.00 $6,800<br />

Service Tap w/ Connection to Existing Residence EA.<br />

!<br />

50! $1,200.00 $60,000<br />

Area 3 Subtotal $269,330<br />

SUBTOTAL CONSTRUCTION $2,093,960<br />

I<br />

CONTINGENCIES (15%)<br />

!<br />

ENGINEERING (1 0%)<br />

I<br />

WATER PLANT SITE/EASEMENTS<br />

-<br />

i<br />

I<br />

I<br />

I<br />

$314,090<br />

I<br />

- --·- --<br />

I<br />

i<br />

!<br />

'<br />

-1------<br />

I<br />

I<br />

'<br />

$24,000<br />

'<br />

·- '<br />

i<br />

!<br />

I ----.--.:~~ +<br />

i<br />

ADMINISTRATION (5%) I !<br />

I<br />

$240,810<br />

$133,640<br />

---- ---,-- . ·-. • ··- ·---~<br />

I I ' !<br />

---~- - - --------------~----<br />

TOTAL WATER DISTRIBUTION SYSTEM<br />

I<br />

---,---- ------------- -<br />

'<br />

!<br />

'<br />

~-- --~- . -- --<br />

$2,806,500<br />

F :\ST ARS\E.NG\500\5 7000200~ reporte st.xls ]WA TE RONSITE I -- --·----------- --- -- ---<br />

21111991 OH I ! I<br />

.<br />

Revised 2/1 0/99

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!