22.10.2014 Views

GENERAL PRINCIPLES - Shivaji University

GENERAL PRINCIPLES - Shivaji University

GENERAL PRINCIPLES - Shivaji University

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

5.6 The sanction accorded to current repairs estimates shall lapse at the end of the<br />

year, but the sanction accorded to special repairs or original works shall hold good<br />

till the repairs or works are completed.<br />

5.7 The sanction accorded for the allotment of funds in the Budget Estimates shall<br />

continue in force till the end of the Year to which it pertains. In the case of original<br />

works and special repairs, however, the Building Committee and the Management<br />

Council may, after calling for a statement of incomplete works at the end of the<br />

year and the probable amount required for completion, sanction a re-allotment of<br />

that amount so that the works may be proceeded in the next year. Such sanctioned<br />

re-allotments shall be included in the ‘Revised Budget’.<br />

Classification of Works<br />

5.8 The works of the <strong>University</strong> are classified as under -<br />

a) Maintenance Works : These works shall include routine maintenance works<br />

and repairs regardless of the total cost to be incurred for their execution.<br />

b) Minor Works : These shall include all original works, special repair works<br />

involving additions and alterations to the existing structure, with an estimated<br />

cost of Rs. twenty-five lakhs or less.<br />

c) Major Works : These shall include original works and special repair works<br />

and involving structural additions and alterations with an estimated cost<br />

exceeding Rs. twenty-five lakhs.<br />

Provided that the classification of major works and minor works shall be based on<br />

P.W.D. manual.<br />

a) Maintenance Works:<br />

The <strong>University</strong> Engineer, shall be responsible for preparation of plans and estimates<br />

for these works and also for their execution and supervision under the guidance<br />

of the Buildings and Works Committee.<br />

b) Minor Works :<br />

All minor works estimated to cost up to and including Rs. twenty five lakhs or the<br />

maximum amount decided by the Government from time to time, shall be executed<br />

by the <strong>University</strong>.<br />

(i)<br />

These works shall be executed by the <strong>University</strong>. The <strong>University</strong> Engineer,<br />

under the directions of the Buildings and Works Committee, shall get prepared<br />

the plans and estimates for such works either through his own staff or where<br />

60<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!