GENERAL PRINCIPLES - Shivaji University
GENERAL PRINCIPLES - Shivaji University
GENERAL PRINCIPLES - Shivaji University
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
(b)<br />
(c)<br />
(d)<br />
(e)<br />
Surveying and mathematical instruments<br />
Books and maps.<br />
Office furniture.<br />
Other articles.<br />
5.55 All articles shall be examined and counted when delivery is taken and entered in<br />
the Measurement Book and Tools and Plant Register. The articles shall be issued<br />
only on receipt of a requisition and their return watched, through a register. The<br />
articles shall be physically checked by the <strong>University</strong> Engineer and a certificate of<br />
such check furnished to the Registrar every year in July. A manuscript register<br />
shall be maintained in the <strong>University</strong> Engineer’s office to show the rent recovered<br />
from contractors for the loan of Tools.<br />
5.56 Whenever any articles are found to be unserviceable or short, a report shall be<br />
made giving the particulars of date of purchase, cost of the articles, reason for<br />
declaring it as unserviceable and the manner in which it is proposed to be finally<br />
disposed of or the circumstances in which the shortage arose. After obtaining<br />
sanction of the competent authority for the write off and/or the disposal of the<br />
articles, a note shall be taken against the entry in the Tools and Plant Register<br />
giving reference to the order and indicating the manner in which the article is<br />
finally disposed of.<br />
Surplus Materials<br />
5.57 All materials remaining over after completion of a work or which have been<br />
received out of works under demolition shall be taken to surplus materials register<br />
to be maintained in the <strong>University</strong> Engineer’s office, prescribed for Tools and<br />
Plant, one page being set apart for each kind of material.<br />
Stock<br />
5.58 Materials which are brought and kept in stock for general use on works will be,<br />
initially debited to the head “stock”. A lump sum provision shall be made for the<br />
purchase of material for stock and an estimate will be prepared and got sanctioned<br />
by the competent authority before making the purchase. All materials shall be<br />
examined, counted or measured, as the case may be, when delivery is taken and<br />
entered in the Measurement Book and thereafter in the Stock Register. Materials<br />
shall be issued only on receipt of an indent. Whenever material is issued for use<br />
on works, the works account will be debited by contra credit to the stock account.<br />
The adjustments in such cases shall be proposed by the <strong>University</strong> Engineer. The<br />
79<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901