22.10.2014 Views

GENERAL PRINCIPLES - Shivaji University

GENERAL PRINCIPLES - Shivaji University

GENERAL PRINCIPLES - Shivaji University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

and the fact reported to the Building Committee for ratification at the time of its<br />

next meeting.<br />

5.20 Repairs<br />

The term “repairs” includes upkeep and maintenance of buildings, equipment or<br />

other asset so as to keep them in proper working order. It also includes minor<br />

additions or alterations which do not materially increase the value of the asset.<br />

5.21 Repairs are generally divided into three kinds.<br />

i) Periodical repairs which are carried out as a matter of routine or rotation and<br />

usually involve the same quantity, from time to time.<br />

ii)<br />

iii)<br />

Repairs which are periodical repairs.<br />

Occasional or petty repairs which may have to be carried out between the<br />

times of periodical repairs.<br />

5.22 Provision for repairs shall be made in the Annual Estimates and shall include<br />

provision for all works establishment including watchmen sanctioned for the care<br />

of building, etc., and cost of material as well as other labour.<br />

Preparation of Estimates -<br />

5.23 To facilitate the preparation of estimates, a schedule of rates for each item of work<br />

commonly executed shall be prepared every year in March, on the basis of the<br />

prevailing rates, by the <strong>University</strong> Engineer and sanctioned by the Vice-Chancellor.<br />

Where it is not practicable to prepare a schedule of rates, the rates adopted by<br />

Public Works Department of the State Government may be adopted.<br />

5.24 Detailed plans and estimates for original works shall be prepared only after the<br />

administrative sanction to the work is accorded. The letter number of the U.G.C.<br />

or the resolution number of the Management Council, according approval shall<br />

always be quoted in the estimate.<br />

5.25 The Estimate shall be prepared generally in the forms used in the Public Works<br />

Department of Government. The <strong>University</strong> Engineer may, however, make additions<br />

or alterations in the heading on the face sheet according to requirements. In<br />

preparing the estimates the instructions given in the Public Works Department<br />

Hand Book shall, as far as possible be followed. A copy of detailed Estimate with<br />

rate analysis shall be furnished to the Accounts Section.<br />

5.26 The estimate shall provide for the complete work and not piece-meal work. The<br />

cost of the work shall generally be calculated at the rates given in the schedule of<br />

69<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!