GENERAL PRINCIPLES - Shivaji University
GENERAL PRINCIPLES - Shivaji University
GENERAL PRINCIPLES - Shivaji University
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
and the fact reported to the Building Committee for ratification at the time of its<br />
next meeting.<br />
5.20 Repairs<br />
The term “repairs” includes upkeep and maintenance of buildings, equipment or<br />
other asset so as to keep them in proper working order. It also includes minor<br />
additions or alterations which do not materially increase the value of the asset.<br />
5.21 Repairs are generally divided into three kinds.<br />
i) Periodical repairs which are carried out as a matter of routine or rotation and<br />
usually involve the same quantity, from time to time.<br />
ii)<br />
iii)<br />
Repairs which are periodical repairs.<br />
Occasional or petty repairs which may have to be carried out between the<br />
times of periodical repairs.<br />
5.22 Provision for repairs shall be made in the Annual Estimates and shall include<br />
provision for all works establishment including watchmen sanctioned for the care<br />
of building, etc., and cost of material as well as other labour.<br />
Preparation of Estimates -<br />
5.23 To facilitate the preparation of estimates, a schedule of rates for each item of work<br />
commonly executed shall be prepared every year in March, on the basis of the<br />
prevailing rates, by the <strong>University</strong> Engineer and sanctioned by the Vice-Chancellor.<br />
Where it is not practicable to prepare a schedule of rates, the rates adopted by<br />
Public Works Department of the State Government may be adopted.<br />
5.24 Detailed plans and estimates for original works shall be prepared only after the<br />
administrative sanction to the work is accorded. The letter number of the U.G.C.<br />
or the resolution number of the Management Council, according approval shall<br />
always be quoted in the estimate.<br />
5.25 The Estimate shall be prepared generally in the forms used in the Public Works<br />
Department of Government. The <strong>University</strong> Engineer may, however, make additions<br />
or alterations in the heading on the face sheet according to requirements. In<br />
preparing the estimates the instructions given in the Public Works Department<br />
Hand Book shall, as far as possible be followed. A copy of detailed Estimate with<br />
rate analysis shall be furnished to the Accounts Section.<br />
5.26 The estimate shall provide for the complete work and not piece-meal work. The<br />
cost of the work shall generally be calculated at the rates given in the schedule of<br />
69<br />