GENERAL PRINCIPLES - Shivaji University
GENERAL PRINCIPLES - Shivaji University
GENERAL PRINCIPLES - Shivaji University
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
duplicate copy shall be returned by the Accounts Section to the <strong>University</strong> Engineer,<br />
after making an endorsement specifying the voucher number and date and the<br />
amount for which it is passed.<br />
(ii)<br />
(iii)<br />
(iv)<br />
(v)<br />
(vi)<br />
When the authorised rate has not been fully earned, a suitable reduction shall be<br />
made therein and the reasons thereof shall be recorded briefly by the <strong>University</strong><br />
Engineer.<br />
An advance payment for work actually executed may be recommended by the<br />
<strong>University</strong> Engineer, who will certify to the effect that the quantity of work actually<br />
done is not less than the quantity for which payment is recommended.<br />
In the case of contract for finished work, the <strong>University</strong> Engineer may recommend<br />
payment of secured advance not exceeding 75 percent of the assessed value of<br />
material brought to site provided such material, is imperishable and is actually<br />
required to be “used on the work, and the agreement drawn up with the contractor<br />
provides that the <strong>University</strong> secures a lien on such materials and that it is<br />
safeguarded against losses due to postponement of the work, or shortage or<br />
misuse and against expenses for their proper watch and safe custody. The<br />
<strong>University</strong> Engineer will be responsible for any overpayment and for watching the<br />
recovery or adjustment of the advances as and when the material is used for the<br />
work.<br />
All works bills (including those in respect of works entrusted to Architects) shall be<br />
thoroughly checked by the Engineering Unit which will ensure that the works have<br />
been executed under proper authority and in accordance with the prescribed<br />
standards and specifications, that the quantities have been correctly measured<br />
and worked out, that the rates and calculations are correct and other conditions<br />
of contract are fulfilled and that the excesses or extra items, if any are covered by<br />
the required sanctions. It will also ensure that the bill is complete in all respects<br />
including arithmetical accuracy in respect of quantities measured, rates allowed<br />
and payment of the dues from the contractor.<br />
The Accounts Section will further scrutinize the bills and make payments to the<br />
contractor or supplier by cheque drawn in his favour. Such cheques shall be<br />
delivered directly to the contractor or the supplier and intimation shall be given to<br />
the <strong>University</strong> Engineer about the payment along with the duplicate copy of the<br />
bill. As soon as the payments are made, the vouchers will be filed chronologically<br />
and posted in the ledger.<br />