GENERAL PRINCIPLES - Shivaji University
GENERAL PRINCIPLES - Shivaji University
GENERAL PRINCIPLES - Shivaji University
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />
(ii) A contractor shall not be given verbal promise of being allowed higher rates<br />
than those agreed upon in consideration of any peculiar or unforeseen<br />
circumstances. If in any case higher rates are considered necessary, specific<br />
orders of the Vice-Chancellor shall be obtained.<br />
5.47 If any item of work which is not included in the original estimates, is required to<br />
be included subsequently, a separate estimate for the extra item shall be prepared<br />
and got approved by the competent authority. The estimate shall be accompanied<br />
by a statement giving complete analysis showing how the rate has been worked<br />
out.<br />
Works Executed through Architects<br />
5.48 In the case of major works entrusted to Architects, the contractors’ bills for the<br />
work done are paid on the basis of the certificates given by the Architects.<br />
However, the <strong>University</strong> Engineer will also associate himself closely with the work<br />
on behalf of the <strong>University</strong> with a view to ensuring that the work is executed<br />
according to the Schedule and that there are no deviations from the prescribed<br />
terms and conditions. He will draw the attention of the Vice-Chancellor if, at any<br />
time, it is found that the work is not progressing according to the fixed schedule<br />
or specifications including material deviations from the quantities of the individual<br />
items of work shown in the original estimates. The bills of the contractors received<br />
through the Architects will be routed through the <strong>University</strong> Engineer so as to<br />
enable him to keep a watch over the progress of the work as well as expenditure<br />
for exercising budgetary control.<br />
Works financed from Grants from the <strong>University</strong> Grants Commission<br />
5.49 The conditions governing the grants sanctioned by the <strong>University</strong> Grants<br />
Commission for works shall be strictly followed. The <strong>University</strong> Engineer shall<br />
ensure that the conditions are strictly observed, that the required information or<br />
reports are furnished without delay.<br />
5.50 Payment of Bills -<br />
(i)<br />
Bills shall be prepared in duplicate in the prescribed forms. Every bill (and muster<br />
roll) shall bear reference to the number and page of the measurement book in<br />
which the measurements of the work are recorded. The name of the contractor<br />
or supplier, name of work or purpose of supply, serial number of the bill, reference<br />
to the agreement or sanction shall invariably be recorded by the <strong>University</strong> Engineer<br />
before certifying the bill for payment. The original bill shall form a payment<br />
voucher and shall be filed in the voucher file in the Accounts Section. The<br />