22.10.2014 Views

GENERAL PRINCIPLES - Shivaji University

GENERAL PRINCIPLES - Shivaji University

GENERAL PRINCIPLES - Shivaji University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901<br />

(ii) A contractor shall not be given verbal promise of being allowed higher rates<br />

than those agreed upon in consideration of any peculiar or unforeseen<br />

circumstances. If in any case higher rates are considered necessary, specific<br />

orders of the Vice-Chancellor shall be obtained.<br />

5.47 If any item of work which is not included in the original estimates, is required to<br />

be included subsequently, a separate estimate for the extra item shall be prepared<br />

and got approved by the competent authority. The estimate shall be accompanied<br />

by a statement giving complete analysis showing how the rate has been worked<br />

out.<br />

Works Executed through Architects<br />

5.48 In the case of major works entrusted to Architects, the contractors’ bills for the<br />

work done are paid on the basis of the certificates given by the Architects.<br />

However, the <strong>University</strong> Engineer will also associate himself closely with the work<br />

on behalf of the <strong>University</strong> with a view to ensuring that the work is executed<br />

according to the Schedule and that there are no deviations from the prescribed<br />

terms and conditions. He will draw the attention of the Vice-Chancellor if, at any<br />

time, it is found that the work is not progressing according to the fixed schedule<br />

or specifications including material deviations from the quantities of the individual<br />

items of work shown in the original estimates. The bills of the contractors received<br />

through the Architects will be routed through the <strong>University</strong> Engineer so as to<br />

enable him to keep a watch over the progress of the work as well as expenditure<br />

for exercising budgetary control.<br />

Works financed from Grants from the <strong>University</strong> Grants Commission<br />

5.49 The conditions governing the grants sanctioned by the <strong>University</strong> Grants<br />

Commission for works shall be strictly followed. The <strong>University</strong> Engineer shall<br />

ensure that the conditions are strictly observed, that the required information or<br />

reports are furnished without delay.<br />

5.50 Payment of Bills -<br />

(i)<br />

Bills shall be prepared in duplicate in the prescribed forms. Every bill (and muster<br />

roll) shall bear reference to the number and page of the measurement book in<br />

which the measurements of the work are recorded. The name of the contractor<br />

or supplier, name of work or purpose of supply, serial number of the bill, reference<br />

to the agreement or sanction shall invariably be recorded by the <strong>University</strong> Engineer<br />

before certifying the bill for payment. The original bill shall form a payment<br />

voucher and shall be filed in the voucher file in the Accounts Section. The<br />

75<br />

1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!