14.11.2014 Views

FSUTMS Comprehensive Modeling Workshop - Cambridge ...

FSUTMS Comprehensive Modeling Workshop - Cambridge ...

FSUTMS Comprehensive Modeling Workshop - Cambridge ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Display Highway Paths (Cont’d)<br />

Step 3 Instructions: Display Highway Path<br />

Exercise 5.2.1<br />

► With the Path Building (Time) dialog box still open, enter the following<br />

combination 277-400<br />

for the origin and 277-330<br />

for the destination and<br />

then click on Single Color box. Select a color and then click OK.<br />

► Click on List Path Traces box and enter a TAZ combination. This will<br />

display the time between nodes in parentheses in minutes in the<br />

Traces box.<br />

► Click on Isochromes box. This will display the Isochromes Display<br />

dialog box. Enter a Cost Increment. . For this example enter 10 and<br />

click on OK. . In the origin zone enter 388 and in the destination zone<br />

enter ALL. . Hit the Enter key or the Display button.<br />

► Click on the Close button to clear the paths and exit the Path Building<br />

dialog box. Close Cube by clicking on the outside X at the top of the<br />

screen.<br />

<strong>FSUTMS</strong>--CUBE MODELING TRAINING SERIES<br />

97<br />

<strong>FSUTMS</strong>--CUBE MODELING TRAINING SERIES<br />

98<br />

5-49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!