14.11.2014 Views

FSUTMS Comprehensive Modeling Workshop - Cambridge ...

FSUTMS Comprehensive Modeling Workshop - Cambridge ...

FSUTMS Comprehensive Modeling Workshop - Cambridge ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PT Best Path Pathbuilder<br />

► Output Files (cont.)<br />

Route Route Evaluation<br />

Route Evaluation operates at a zone pair level and for each such<br />

pair, produces a best path and the cost of using this route.<br />

The best path that is stored in the *.rte file can be displayed in<br />

Cube from the PATH menu with “Use<br />

PATH File” and selecting<br />

the *.rte file with the transit layer active. The costs are saved to<br />

the skim matrices.<br />

Skimming<br />

Skim matrices ~ Pk W TRN Skim (TSKIMPK1_TEM.mat)<br />

Pk A TRN Skim(TSKIMPK2_ayy.mat)<br />

Op W TRN Skim(TSKIMOP1_TEM.mat)<br />

Op P TRN SKIM (TSKIMOP2_ayy.mat)<br />

Link attribute table in .dbf format (optional)<br />

<strong>FSUTMS</strong>--CUBE MODELING TRAINING SERIES<br />

71<br />

PT Best Path Pathbuilder<br />

Walktime: : Walk Time<br />

AutoTime: : Auto Time<br />

SidewalkTime: : Sidewalk Time<br />

BUSTIME: : Bus Time<br />

PBUSTIME: : Premium Bus Time<br />

CIRCTIME: : Circulator Time<br />

RAILTIME: : Rail Time<br />

COMRLTIME: : Commuter Rail Time<br />

OTHTIME: : Other Transit Mode Time<br />

PRJTIME: : Project Time<br />

XFER: : Transfer<br />

IWAIT: : Initial Wait Time<br />

XWAIT: : Transfer Wait Time<br />

FARE: : Cost<br />

TOTTIME: : Total Time Between Zones<br />

Off-Peak Period Walk to Transit Matrix<br />

<strong>FSUTMS</strong>--CUBE MODELING TRAINING SERIES<br />

72<br />

7-36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!