21.11.2014 Views

Draft EA - San Diego International Airport

Draft EA - San Diego International Airport

Draft EA - San Diego International Airport

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7<br />

2. Proposed Action<br />

Specific projects to be addressed in Environmental Assessment<br />

• Relocate displaced threshold on Runway 09 from 700 feet to<br />

1,000 feet<br />

• Consolidated rental car facility (CONRAC)<br />

• Air cargo warehouse facilities and central receiving and<br />

distribution center<br />

• Reconfigured parking facilities and general aviation facilities<br />

• Terminal link roadway<br />

• Utility improvements

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!