SAN DIEGO INTERNATIONAL AIRPORT – PROPOSED RUNWAY 9 DISPLACED THRESHOLD<br />

<br />

Approval of the appropriate amendments to the <strong>Airport</strong> Certification Manual pursuant to 14 CFR Part<br />

139 and 49 U.S.C. 44706 and/or approval of an application to use Passenger Facility Charges (PFCs).<br />

Appropriate amendment to air carrier operations specifications pursuant to 49 U.S.C. § 44705.<br />

<br />

<br />

Determination under 49 U.S.C. 44502(b) that the Proposed Action is reasonably necessary for use in<br />

air commerce or in the interest of national defense.<br />

Continued close coordination with the City of <strong>San</strong> <strong>Diego</strong> and appropriate FAA program offices, as<br />

required, to ensure safety during construction pursuant to 14 CFR Part 139, Certification of <strong>Airport</strong>s,<br />

under 49 U.S.C. 44706.<br />

1.7 General Implementation Timeframe<br />

After careful review of the Environmental Assessment, if FAA issues a finding that determines that the<br />

proposed project would result in no significant environmental impacts, then approval of the ALP to allow<br />

construction of the proposed project would be made. Construction of the Proposed Action would occur<br />

within 12 months if a favorable environmental finding is issued.<br />

<strong>Draft</strong> <strong>EA</strong><br />

Purpose and Need<br />

[1-27]