SCOPING MEETING - 11/16/2011<br />

Page 10<br />

1 the surface parking lot or long-term parking lots'<br />

2 shuttle vehicle.<br />

3 This will remove those vehicle trips, those<br />

4 shuttle trips from the City-dedicated streets and<br />

5 provide a connection from the Northside to the<br />

6 Southside, avoiding the intersections along North Harbor<br />

7 Drive at Laurel and Pacific Highway.<br />

8 So these are the components that are being<br />

9 analyzed as what we call collectively the Northside<br />

10 Improvements.<br />

11 I'd like to recap the primary purpose for these<br />

12 improvements. They are to accommodate air service<br />

13 demand through the planning horizon year of 2020. All<br />

14 of these improvements that are described will be<br />

15 evaluated with the assumption that they will be<br />

16 constructed and begin operations beginning in 2015.<br />

17 And another purpose of this project is to<br />

18 efficiently utilize the airport's property and existing<br />

19 facilities, as well as to also relieve airfield and<br />

20 terminal area congestion, in terms of separating and<br />

21 increasing the separation between some of the aircraft<br />

22 movement areas and general aviation and air cargo.<br />

23 Some other points related to the need for the<br />

24 project are to meet the FAA's criteria to maintain<br />

25 category one instrument approach, or instrument approach<br />

Page 11<br />

1 for aircraft, and also provide general aviation air<br />

2 cargo and ground transportation facilities to meet the<br />

3 project demand through the year 2020.<br />

4 With that, I'll turn it to Steve Culberson, who<br />

5 will describe the Environmental Review process.<br />

6 MR. CULBERSON: As Ted mentioned, the airport<br />

7 adopted a master plan and conducted an EIR on the master<br />

8 plan in 2008. That was a State environmental review<br />

9 process under the California Environmental Quality Act.<br />

10 And then in September of this year they<br />

11 certified a supplemental EIR which examined the proposed<br />

12 Northside Improvement projects; and those documents, as<br />

13 Ted said, are available on the Authority's website.<br />

14 So today this process -- the scope of process<br />

15 is the kick-off for the Federal Environmental Review<br />

16 process under the National Environmental Policy Act.<br />

17 We will be preparing an environmental<br />

18 assessment which will look at the purpose and need for<br />

19 the proposed action, why these projects are needed at<br />

20 the airport, alternatives to the proposed action, and it<br />

21 will describe the affected environment, and it will look<br />

22 at potential environmental effects of implementing the<br />

23 proposed action and any feasible alternatives.<br />

24 The draft <strong>EA</strong> will be released early next year,<br />

25 and it will be released for public and agency review.<br />

Page 12<br />

1 After the comment period is closed, we will look at the<br />

2 comments that have been received, address those<br />

3 comments, go over them with FAA, and develop a final<br />

4 Environmental Assessment; and then FAA will take that<br />

5 final Environmental Assessment and issue a finding on<br />

6 the projects.<br />

7 The preliminary alternatives that have been<br />

8 identified to date are -- besides the proposed action,<br />

9 which Ted has described, include use of other airports<br />

10 or other locations on airports.<br />

11 And NEPA also requires that the FAA consider<br />

12 the no action alternative. The no action will be<br />

13 the -- what the proposed action and other alternatives<br />

14 are compared to to determine the extent of environmental<br />

15 effects.<br />

16 And with that, I'm going to turn it over to<br />

17 Tony, who is going to talk a little bit about some of<br />

18 the environmental effects that will be examined.<br />

19 MR. SKIDMORE: Thank you, Steve.<br />

20 Good evening. The FAA requires that a variety<br />

21 of topics be addressed at an Environmental Assessment.<br />

22 On your screen are the 19 categories of topics<br />

23 or environmental issues that must be addressed in an<br />

24 Environmental Assessment.<br />

25 The document for the proposed action will<br />

Page 13<br />

1 address all of those issues, although some of them, such<br />

2 as farmlands and wild and scenic rivers, the analysis<br />

3 will be limited to simply noting that those resources<br />

4 don't occur at the project site.<br />

5 Other topics, about a half dozen in particular<br />

6 that I'll go over, we'll provide a close look at, such<br />

7 as air quality. The Environmental Assessment will look<br />

8 at the potential impacts to air quality from what are<br />

9 known as criteria polutants, carbon monoxide, nitrogen<br />

10 oxides, things that are regulated by the U.S. EPA.<br />

11 The air quality analysis within the <strong>EA</strong> will<br />

12 also look at greenhouse gases which are becoming an<br />

13 increasingly important issue within environmental<br />

14 documents.<br />

15 The <strong>EA</strong> will look at compatible land uses, and<br />

16 in that regard we'll look at the relationship of the<br />

17 proposed improvements to all of the applicable plans and<br />

18 programs for the airport, as well as for the military.<br />

19 Construction impacts will look at air quality,<br />

20 noise, and traffic impacts associated with construction<br />

21 of the proposed improvements. Cumulative impacts, in<br />

22 addition to the impacts of proposed Northside<br />

23 Improvements, we'll look at the larger picture, what are<br />

24 the collective impacts of all of the master planned<br />

25 improvements, as well as other relevant projects in the<br />

4 (Pages 10 to 13)<br />

Merrill Corporation - Los Angeles<br />

Los Angeles - 800-826-0277<br />

www.merrillcorp.com/law

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!