21.11.2014 Views

Draft EA - San Diego International Airport

Draft EA - San Diego International Airport

Draft EA - San Diego International Airport

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SAN DIEGO INTERNATIONAL AIRPORT – PROPOSED RUNWAY 9 DISPLACED THRESHOLD<br />

Table 3-6 (1 of 3)<br />

Past, Present, and Reasonably Foreseeable Future Actions in the Study Area<br />

PAST ACTIONS<br />

PROJECT NAME LOCATION DESCRIPTION CURRENT STATUS<br />

Laurel and Kettner Parking<br />

West corner of<br />

Kettner Blvd. & W.<br />

Laurel St.<br />

442,358 square-foot parking structure was<br />

constructed on this 0.85-acre formerly Industrial<br />

Small Lot (IS-1-1) Zone. Mitigated Negative<br />

Declaration issued May 2007 for this project.<br />

Completed.<br />

Date Street Storm Drain<br />

Improvements<br />

Date Street &<br />

Kettner Blvd.<br />

Date Street storm drain improvements completed<br />

by the Centre City Development Corporation in the<br />

area of Kettner Blvd. and India St.<br />

Completed August<br />

2010.<br />

Water and Sewer Pipeline<br />

Projects in Point Loma<br />

Point Loma area<br />

(west of SDIA)<br />

Various sewer and water infrastructure replacement<br />

projects in the Point Loma area.<br />

Completed 2011.<br />

NTC Park<br />

Former Naval<br />

Training Center<br />

46-acre public park with 3-acre eastern shoreline<br />

esplanade area at the formal Naval Training Center.<br />

Completed December<br />

2009.<br />

The Pavilion on Broadway Pier Broadway Pier Port Pavilion on Broadway Pier is a 52,000 squarefoot<br />

multi-use facility that includes a cruise ship<br />

terminal to accommodate 2,600 passengers, a shore<br />

power system, and Leadership in Energy and<br />

Environmental Design (LEED)-certified design.<br />

Completed December<br />

2010.<br />

Veterans Village of <strong>San</strong> <strong>Diego</strong><br />

4141 Pacific<br />

Highway<br />

This project includes a $22 million rehabilitation<br />

center and a range of services to homeless veterans.<br />

Phase I included a 112-bed early treatment facility<br />

and state-of-the-art living and support facilities.<br />

Phase II added an additional 112 beds, a medical<br />

facility, employment center and an administration<br />

building. Phase III added 96 additional beds, a<br />

storage warehouse and 125 parking spaces.<br />

Phase I completed July<br />

2006. Phase II<br />

completed September<br />

2009. Phase III<br />

completed in December<br />

2010.<br />

Expand existing Terminal 2<br />

West with 10 new jet gates<br />

SDIA<br />

Construct an addition to the existing Terminal 2<br />

West that will include approximately 430,100 square<br />

feet of new space, 10 additional aircraft gates, and<br />

approximately 2,250 lineal feet of new and<br />

reconfigured vehicle curb front on two levels and<br />

approximately 1,800 feet of lineal curb front<br />

dedicated to commercial vehicles in a transit plaza.<br />

Under construction<br />

(estimated completion<br />

in 2013).<br />

Construct new aircraft parking<br />

and replacement Remain-<br />

Over-Night aircraft parking<br />

apron<br />

SDIA<br />

This new aircraft parking apron is being constructed<br />

to accommodate up to 10 jet aircraft adjacent to the<br />

new Terminal 2 West taxilane.<br />

Under construction<br />

(estimated completion<br />

in 2013).<br />

Construct new apron and<br />

aircraft taxilane<br />

SDIA<br />

This new aircraft apron pavement will be built<br />

adjacent to and west of the proposed aircraft gates<br />

at Terminal 2 West. It will be used as an aircraft<br />

taxilane for aircraft to taxi between the runway and<br />

the new proposed gates.<br />

Under construction<br />

(estimated completion<br />

in 2013).<br />

Affected Environment<br />

[3-40]<br />

<strong>Draft</strong> <strong>EA</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!