DRAFT, 4/9/85<br />

( 2 Strict speed limits- .- should be. .. established and 2:.<br />

adhered to on all. access .roads. and within :the--ROW,.':.':. '.. --,.. i... . :<br />

to assure that fugitive dust emissions will be<br />

minimized.<br />

(3) The Applicant should recommend to the individual<br />

contractors that they provide group transportation<br />

(as discussed under transportation impacts) to<br />

minimize vehicular traffic on unpaved roads in the<br />

area.<br />

(4) When vegetation is removed from the ROW during the<br />

early stages of construction, the cleared areas<br />

should be kept to the absolute minimum necessary.<br />

This will aide in the mitigation of the problems<br />

caused by wind erosion and vehicle borne 'fugitive<br />

dust.<br />

(5) In areas where devegetation has taken place, revegetation<br />

efforts should commence at the earliest<br />

possible opportunity, In those areas where immediate<br />

revegetation is not possible, alternative<br />

stabilization measures should be implemented.<br />

These measures could include matting, mulching,<br />

and even mu1ching"with seed and fertilizer, (More<br />

details on revegetation are presented section 10.3<br />

of this Master Mitigation Plan.)<br />

(6) Dust suppression at all work areas within the ROW<br />

and at work camps, staging areas, etc, , should be<br />

accomplished with the regular and frequent use of<br />

water trucks. Arrangements for the acquisition of<br />

water ' ShQuld be made with eit-her local landowners,<br />

agencies or associations. It is anticipated that<br />

such activities would occur two or more times<br />

daily during the driest periods,<br />

(7) Any open burning required for the purpose of slash<br />

disposal or for any other reason during construction<br />

or operation of the rail line should be<br />

conducted in strict accordance with locai' regulations,<br />

All necessary permits should be obtained<br />

and all necessary safety precautions observed,<br />

-1 98- <strong>Volume</strong> Ill: <strong>Public</strong> <strong>Comment</strong>